My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2003-114
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2003
>
Reso 2003-114
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2009 4:26:06 PM
Creation date
8/14/2009 1:18:37 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
5/19/2003
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN LEANDRO ADMINISTRATIVE CODE <br />TITLE 12 PUBLIC WORKS <br />Chapter 5 Uniform Wastewater Discharge <br />Regulations <br />transferred to, or used for, any other property other than the property for which the <br />sewer permit was originally issued. <br />(g) All sewer rates, charges, and fees as herein provided shall be non-refundable. <br />(h) Reference is made to the City's "Procedures and Policies for Sewer Connection Fees" <br />on file with the City Clerk and incorporated herein by this reference. <br />12.5.120: WASTEWATER DISCHARGE PERMITS. <br />(a) Reference is made to the Uniform Wastewater Discharge Regulations previously <br />adopted by the City of San Leandro as Title III, Chapter 14, and on file with the City <br />Clerk. All references herein to "Regulations" shall be to the aforementioned <br />regulations. <br />(b) The Regulations require that Major Contributing Industries, as defined in Section 3- <br />14-200 of the Regulations, connected to or discharging into the City sewer must <br />obtain a Pretreatment Permit. <br />(c) Section 3-14-520 of the Regulations lists standard permit conditions. <br />(d) Applications for the Pretreatment Permit will be kept on file by the City. Major <br />Contributing Users shall be issued a permit upon completion of the application. <br />(e) Upon receipt of the completed application, City staff will schedule an inspection of <br />each applicant's facility. This will verify and complete the information provided on <br />the application. <br />(f) Upon issuance or renewal of the permit, a permit fee as set forth in San Leandro <br />Administrative Code Section 6.4.100, on file with the City Clerk and incorporated <br />herein by this reference, shall be charged. <br />(g) A condition of any Pretreatment Permit shall be the requirement that the permittee <br />pre-treat the wastewater to acceptable limits for conventional pollutants and to <br />specified concentration for conservative pollutants, as described in applicable <br />Federal, State andJor City regulations. <br />07-O1-03 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.