My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2003 Winzler & Kelly Consulting Engineers
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2003
>
Agmt 2003 Winzler & Kelly Consulting Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2009 9:35:39 AM
Creation date
8/17/2009 9:13:14 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
6/16/2003
Retention
PERM
Document Relationships
Reso 2003-135
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B-1 <br />COSTS OF SERVICES <br />The following is a breakdown of fees based on the project phase /scope of work tasks: <br />Task Description /Deliverable <br />3.0 Design Report /Preliminary Design <br />3.1 Verify Site Conditions, including <br /> Vacuum Extraction Utility Location <br />3.2 Augment Topographic Survey <br />3.3 Design Report/Planning Study <br />3.4 Comment Response Report <br />3.5 Coordination Meetings <br />3.6 Public Meeting/Preparation <br />3.7 Design Management <br />4.0 -Construction Documents (70% Submittal) <br />4.1 Design Development (70% Construction Documents) <br />4.2 Coordination Meetings <br />4.3 Public Meetings <br />4.4 Comment Response Report <br />4.5 Permitting /Approvals Submittal <br />4.6 Design Management <br />S. 0 -Construction Documents (100% Submittal) <br />5.1 100% Construction Documents <br />5.2 Coordination Meetings <br />5.3 Comment Response Report <br />5.4 Permitting /Approvals Submittal <br />5.5 Design Management <br />Total <br />$ 1,555 <br />$ 6,080 <br />$ 14,780 <br />$ 56,685 <br />Included in 3.3 above <br />Included in 3.3 above <br />$ 9,669 <br />Included in 3.3 above <br />$89,470 <br />Included in 4.1 above <br />Included in 3.6 above <br />Included in 4.1 above <br />Included in 4.1 above <br />Included in 4.1 above <br />$57,215 <br />Included in 5.1 above <br />Included in 5.1 above <br />Included in 5.1 above <br />Included in 5.1 above <br />6.0 - Final Construction /Bid Documents <br />6.1 Final Construction Documents $23,855 <br />6.2 Coordination Meeting Included in 6.1 above <br />6.3 Comment Response Report Included in 6.1 above <br />6.4 Utility Company Sign Off Included in 6.1 above <br />6.5 Design Management Included in 6.1 above <br /> Total $259,309 <br />CSA-Winzler and Kelly <br />West Estudillo/Historic Downtown Improvement <br />Page 15 of 25 <br />Project No. 961-86-045 <br />
The URL can be used to link to this page
Your browser does not support the video tag.