Laserfiche WebLink
n <br />0 <br />w <br />w <br />0 <br />°~ <br />p <br />., <br />w <br />0 <br />C <br />b <br />ow b <br />~ awo <br />w CD <br />~* rn <br />o <br />M <br />C7 to <br />b <br />FEE SCHEDULE <br /> <br />CIBSSIfICatlOn: <br />Hourly Rate: Principal <br />Eng/Sci <br />$170.00 Sr Engineer/ <br />Scientist <br />$158.00 Sr. Staff <br />EngJSc. <br />$98.00 Staff <br />Eng./Sc. <br />$83.00 Desgnr! <br />Sr. Tech. <br />$87.00 word <br />Procsr <br />$58.00 Total <br />Hour Total <br />Labor Cost <br />Electrical Work Design -PLC $12,aoo <br />Seismic Upgrade Design $4,500 <br />Task 7 -Bid Support $2,84° <br />Task 8 -Construction Support <br />Submittal Review (12-18 Reviews) a s 20 32 $3,z5s <br />RFI Response (5-15 RFIs) 1 2 a a 1 20 $1,992 <br />Slte VISItS 4 2 6 $528 <br />Site Meetings s s $49a <br />Record Drawings 1 a 2 1s 23 $2,o7s <br />Project Management 1 2 3 $336 <br /> <br />LABOR HOURS 2 7 32 32 16 1 90 C~ <br />LABOR $ $340 $1,106 $2,656 $3,136 $1,392 $58 $28,828 <br />SUBTOTAL $28,828 <br /> <br />SUBCONSULTANTS <br />Terada Engineering (Electrical Support) $17,700 <br />10% subconsultant marku $1,770 <br />MISCELLANEOUS EXPENSES <br />CADD $192 <br />Mileage (5 trips @ 68 miles/trip X $.36/mile} $122 <br />Printing $188 <br />TOTAL 348,800 <br /> <br />r-r <br />F--~ <br />H <br />t~ <br />