Laserfiche WebLink
1 S. PROFESSIONAL SEAL. Where applicable in the determination of the contract <br />administrator, the first page of a technical report, first page of design specifications, and each <br />page of construction drawings shall be stamped/sealed and signed by the licensed professional <br />responsible for the report/design preparation. The stamp/seal shall be in a block entitled "Seal <br />and Signature of Registered Professional with report/design responsibility" as per sample below. <br />Seal. and Signature of Registered Professional with <br />report/design responsibility <br />Exhibit D Page 7 of 7 <br />G:\Oliver\Paratransit\MV Contract Aug 03 -Feb 04 <br />