My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2003 Collaborative Design Architects Inc
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2003
>
Agmt 2003 Collaborative Design Architects Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2009 10:43:23 AM
Creation date
8/18/2009 10:43:22 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
7/21/2003
Retention
PERM
Document Relationships
Reso 2003-182
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A-1 <br />DETAILS OF DESIGN <br />Design shall be done in accordance with the California Building Standards Code, and all <br />codes adopted by the permitting agency. <br />The scope of this contract includes all professional services required to complete the <br />work outlined in exhibit A. No work shown on the plans or listed in the specifications <br />shall be `design build' unless it is specifically listed in exhibit A, or approved in writing <br />by the City. <br />Unique, proprietary, or experimental designs and materials are prohibited. <br />Specification shall be CSI format. Front end specifications (section 0000 - 0999) shall <br />be prepared by the City. Contractor shall prepare all other specifications. Contractor <br />shall coordinate the work with the front end specifications prepared by the City. <br />Performance specifications are prohibited. Specifications shall be coordinated with the <br />plans. <br />The City of San Leandro has budgeted $150,000 for the construction of improvements <br />including FF & E, signage, and contingency (at 15%) but excluding permit fees, <br />inspection costs, and utility company fee's. Contractor shall be responsible for designing <br />within the budget, should estimates indicate that the contingency is below 7% then the <br />contractor shall, without additional fee or cost to the City, modify the documents <br />produced under this agreement as required to comply with the budget. <br />The City has a standard door hardware specification guideline. All work shown shall <br />conform to said guideline. <br />The City has standard plans that indicate details of construction of many site <br />improvements. All work shown shall conform to the standard plans. <br />Main Library Bookstore Page 7 of 20 <br />Collaborative Design Architects, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.