Laserfiche WebLink
Other Services <br />Court Appearances and Depositions $275/hour <br />(8-hour minimu@ <br />Court Preparation applicable hourly rates <br />Consultants and Other Outside Charges actual cost + 15% <br />Vehicle Transportation actual cost + 15% <br />In-house Computer Services $30/hour <br />Travel Time applicable hourly rates <br />ESTIMATED BUDGET: <br />Phase 2 -Construction Documents, Specifications & Estimate (PS&E's) <br />John Cahalan, Landscape Architect: <br />Task Description Principal Land. Arch. #1 AutoCAD <br />2.01 Topographic survey (to be provided by the Gity) <br />2.02 Meetings (3) 9 0 0 <br />2.03 70% Submittal (16 sheets) 35 90 100 <br />2.04 90% Submittal 20 35 30 <br />2.05 100% Submittal 12 16 24 <br />2.06 Cost Estimate 10 6 0 <br />Total hours 86 147 154 <br />Principal 86 hrs @ $140 $12,040 <br />Landscape Architect 1 147 hrs @ $110 $16,170 <br />AutoCAD Design 154 hrs (a~ $90 $13,860 <br />Subtotal $42,070 <br />Creegan & D'Angelo, Civil Engineers: <br />Task Description P.M. Assoc. Eng. Adm. Asst. <br />2.01 Topographic survey (to be provided by the City) <br />2.02 Meetings (4) 9 0 0 <br />2.03 70% Submittal (10 sheets) 35 100 20 <br />2.04 90% Submittal 18 30 10 <br />2.OS 100% Submittal 6 20 10 <br />2.06 Cost Estimate 4 0 0 <br />Total hours 72 150 40 <br />Project Manager 72 hrs @ $165 $11,880 <br />Associate Engineer 150 hrs @ $110 $16,500 <br />Administrative Assistant 40 hrs (a~ $65 $2,600 <br />Subtotal $30,980 <br />GSA/]ohn Cahalan Landscape Page 9 of 19 <br />Lewelling Boulevard Landscape Median Project No. 210-38-231 <br />