My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2003 Winzler & Kelly Consulting Engineers (2)
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2003
>
Agmt 2003 Winzler & Kelly Consulting Engineers (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2009 4:41:26 PM
Creation date
8/19/2009 9:33:35 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
11/3/2003
Retention
PERM
Document Relationships
Reso 2003-223
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />SCOPE OF SERVICES <br />1.0 DESCRIPTION OF PROJECT <br />Contractor shall provide design services for the conceptual studies and the completion of <br />construction documents for street renovations for the Downtown Area. The work will be <br />coordinated with adjacent design work. The Downtown Area, as shown on the attached Figure <br />1, is more specifically defined as follows: <br />• Washington Square Mall Pedestrian North- South Walkway-North-South <br />pedestrian path between West Joaquin and West Juana Avenue <br />• Washington Square Mall Parking Lot Lane-Eastside lane between Lyons <br />Restaurant and West Juana Avenue <br />• Washington Avenue between West Juana and Parrott Street <br />• Washington Square Mall Parking Lot Lane-Westside lane between Davis Street <br />and West Juana Avenue <br />• Hays Street between Davis Street and West Juana Ave <br />• West Joaquin between East 14th Street and Washington Square Mall (WSM) <br />Westside Lane <br />• Parrott Street between East 14th Street and Washington Avenue <br />• Washington Square Mall Pedestrian Northern East/West Pathway. The path <br />aligned east/west between and parallel to West Estudillo Avenue and West <br />Joaquin with eastern end at East 14th Street <br />• Washington Square Mall Pedestrian Southern EastlWest Pathway. The path <br />aligned eastlwest between and parallel to West Joaquin and West Juana Avenue <br />with eastern end at East 14th Street <br />• Note that the West Estudillo Avenue Corridor is not included in the above area as <br />it is included in a separate project. <br />Improvements proposed within the project area include upgrading existing street lighting <br />by replacement with, or addition of, decorative street lighting on all the above described streets. <br />Additional pedestrian and streetscape improvements are also included for special areas within the <br />Washington Plaza Shopping Center near the West Joaquin Corridor from East I4th Street to <br />CSA-Winzler and Kelly Page 3 of 30 <br />Downtown Lighting and Pedestrian Enhancements Project No. 961-83-054 <br />
The URL can be used to link to this page
Your browser does not support the video tag.