Laserfiche WebLink
Street Lighting 1"=60' scale master plan for the project area and layouts showing one <br />City block each of the three street lighting alternatives. <br />Deliverable: Ten (10) copies of report and drawings. <br />2.2 Comment Response Report <br />Contractor shall meet with City, review draft response to comments, and prepare a letter <br />report that will be a compilation of all agency comments with responses cited <br />immediately below each comment. Issue report two weeks after meeting. <br />2.3 Coordination Meetings <br />Contractor shall attend and prepare minutes of four (4) meetings with City staff. <br />Contractor shall coordinate and meet with Design Team. <br />These meetings are assumed to occur at the same time as meetings for the East 14`~ Street <br />Project. <br />3.4 Public Meetings <br />Contractor shall prepare presentation material and attend up to four (4) speciaUpublic <br />meetings. Present Design Report and Schematic Design. The City shall provide public <br />notification. Presentation materials include 22" x 34" graphic boards and power point <br />presentation. Contractor shall prepare minutes of the meetings. <br />These meetings are assumed to occur at the same time as meetings for the East 14tH <br />Street/ Davis Street Project. <br />3.5 Design Management <br />Contractor shall provide overall project management and maintain effective <br />communications with City staff throughout the duration of this phase. Within the first <br />week following contract Notice To Proceed Contractor shall prepare a Project Wank Plan <br />that outlines the Contractor's approach, schedule, and identified deliverables. The Work <br />Plan shall he distributed to the project team and our client representative. <br />The Contractor's project manager shall hold a Design Concept Review meeting. This <br />brainstorming session shall involve the Contractor's project team and in-house <br />constructability specialists, and City staff. The Design Concept Review shall discuss the <br />project approach, identify critical issues, and suggest alternative solutions as appropriate <br />that provide enhanced function or reduced cost. <br />With each monthly invoice, Contractor shall provide a project status report that outlines <br />work completed and budget expenditures. This status report allows the Contractor's <br />CSA-Winzler and Kelly Page 9 of 30 <br />Downtown Lighting and Pedestrian Enhancements Project No. 961-83-054 <br />