My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2003 Winzler & Kelly Consulting Engineers (3)
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2003
>
Agmt 2003 Winzler & Kelly Consulting Engineers (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2009 9:44:48 AM
Creation date
8/19/2009 9:44:46 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
11/3/2003
Retention
PERM
Document Relationships
Reso 2003-224
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B-1 <br />COST OF SERVICES <br />The following is a breakdown of fees based on the project phase /scope of work tasks. <br />Reimbursable costs are included in these costs: <br />Task Description /Deliverable Total <br />3.0 Design Report /Preliminary Design <br />3.1 Concept Design Report /Schematic Design $27,090 <br />3.2 Comment Response Report Included in 3.1 above <br />3.3 Coordination Meetings Included in 3.1 above <br />3.4 Fublic Meetings Included in 3.1 above <br />3.5 Design Management Included in 31 above <br />4.0 -Design Development Plans <br />4.1 ~ Verify Existing Site Conditions Included in 4.2 below <br />4.2 Topographic Survey Enhancement $32,800 <br />4.3 Design Development PS&E $19,805 <br />4.4 Coordination Meetings Included in 4.3 above <br />4.5 Public Meetings Included in 4.3 above <br />4.6 Comment Response Report Included in 4.3 above <br />4.7 Permitting /Approvals Submittal Included in 4.3 above <br />4.8 Design Management Included in 4.3 above <br />5.0 -Construction Documents (70% Submittal) <br />5.1 Design $18,533 <br />5.2 Coordination Meetings Included in 5.1 above <br />S.3 Public Meetings Included in 5.1 above <br />5.4 Comment Response Report Included in 5.1 above <br />5.5 Permitting /Approvals Submittal Included in 5.1 above <br />5.6 Design Management Included in 5.1 above <br />6.0 -Construction Documents (100% Submittal) <br />6.1 Design $14,930 <br />6.2 Coordination Meetings Included in 6.1 above <br />6.3 Public Meetings Included in 6.1 above <br />6.4 Comment Response Report Included in 6.1 above <br />6.5 Permitting /Approvals Submittal Included in 6.1 above <br />6.6 Design Management Included in 6.1 above <br />7.0 -Final Construction /Bid Documents <br />7.1 Final Construction Documents $11,327 <br />7.2 Coordination Meeting Included in 7.1 above <br />7.3 Comment Response Report Included in 7.1 above <br />7.4 Design Management Included in 7.1 above <br />CSA-Winzler and Kelly Page 17 of 28 <br />Davis St/East 14`~ St Lighting and Pedestrian Enhancements Project No. 962-83-062 <br />
The URL can be used to link to this page
Your browser does not support the video tag.