My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2003 Winzler & Kelly Consulting Engineers (3)
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2003
>
Agmt 2003 Winzler & Kelly Consulting Engineers (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2009 9:44:48 AM
Creation date
8/19/2009 9:44:46 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
11/3/2003
Retention
PERM
Document Relationships
Reso 2003-224
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />SCOPE OF SERVICES <br />1.0 DESCRIPTION OF PROJECT <br />Contractor shall provide design services for the conceptual studies and the completion of <br />construction documents for street lighting and crosswalk renovations for East 14th Street <br />from Hays Street to Parrot Street and Davis Street between East 14th Street and Hays <br />Street (see Exhibit A-1). <br />The design will upgrade the existing street lighting by replacement with or addition of <br />decorative street lighting on all the above described streets. Additionally, the East 14th <br />Street intersections of Hays Street, Estudillo Avenue and Parrott Street will receive <br />crosswalk paving enhancement (no ADA ramp improvements). This work will be <br />coordinated with adjacent design work occurring at other locations throughout the <br />downtown area. <br />2.0 CITY AND GENERAL REQUIREMENTS <br />2.1 Design Team <br />Contractor has proposed the following architects and design consultants and sub- <br />consultants. <br />WINZLER AND KELLY CONSULTING ENGINEERS (Prime Contractor) <br />Civil Engineering, Electrical Engineering, Structural Engineering <br />GOLDEN ASSOCIATES (DBE Subcontractor) <br />Landscape Architect <br />The Contractor shall be responsible to the City for the accuracy, quality and performance <br />of all subcontracted work; as well as to ensure coordination between all design <br />disciplines. Subcontractors may not be substituted without concurrence from the City. <br />The Contractor shall use qualified technicians and support staff for the production of <br />other functions to complete the work. The selected consultants must maintain auditable <br />records, documents and papers for inspection by authorized City Staff for a minimum. of <br />three years after project completion. <br />CSA-Winzler and Kelly Page 3 of 28 <br />Davis St/East 14`~ St Lighting and Pedestrian Enhancements Project No. 962-83-062 <br />
The URL can be used to link to this page
Your browser does not support the video tag.