Laserfiche WebLink
EXHIBIT A <br />SCOPE OF SERVICES <br />1.0 DESCRIPTION OF PROJECT <br />Contractor shall provide design services for the conceptual studies and the completion of <br />construction documents for street lighting and crosswalk renovations for East 14th Street <br />from Hays Street to Parrot Street and Davis Street between East 14th Street and Hays <br />Street (see Exhibit A-1). <br />The design will upgrade the existing street lighting by replacement with or addition of <br />decorative street lighting on all the above described streets. Additionally, the East 14th <br />Street intersections of Hays Street, Estudillo Avenue and Parrott Street will receive <br />crosswalk paving enhancement (no ADA ramp improvements). This work will be <br />coordinated with adjacent design work occurring at other locations throughout the <br />downtown area. <br />2.0 CITY AND GENERAL REQUIREMENTS <br />2.1 Design Team <br />Contractor has proposed the following architects and design consultants and sub- <br />consultants. <br />WINZLER AND KELLY CONSULTING ENGINEERS (Prime Contractor) <br />Civil Engineering, Electrical Engineering, Structural Engineering <br />GOLDEN ASSOCIATES (DBE Subcontractor) <br />Landscape Architect <br />The Contractor shall be responsible to the City for the accuracy, quality and performance <br />of all subcontracted work; as well as to ensure coordination between all design <br />disciplines. Subcontractors may not be substituted without concurrence from the City. <br />The Contractor shall use qualified technicians and support staff for the production of <br />other functions to complete the work. The selected consultants must maintain auditable <br />records, documents and papers for inspection by authorized City Staff for a minimum. of <br />three years after project completion. <br />CSA-Winzler and Kelly Page 3 of 28 <br />Davis St/East 14`~ St Lighting and Pedestrian Enhancements Project No. 962-83-062 <br />