Laserfiche WebLink
1 <br />15. PROFESSIONAL SEAL. Where applicable in the determination of the contract <br />administrator, the first page of a technical report, first page of design specifications, and <br />each page of construction drawings shall be stamped/sealed and signed by the licensed <br />professional responsible for the report/design preparation. The stamp/seal shall be in a <br />block entitled "Seal and Signature of Registered Professional with report/design <br />responsibility' as per sample below. <br />-.Seal and Signature afRegistered Professional <br />with reportfdesign responsibility <br />Contractual Services Agreement <br />Monarch Bay Drive/Fairway Drive to Marina Boulevard <br />Page l9 of 19 <br />Project No. 120-3s-243 <br />