My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2003 BKF Engineers
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2003
>
Agmt 2003 BKF Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2009 3:01:55 PM
Creation date
8/20/2009 3:01:54 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
3/3/2003
Retention
PERM
Document Relationships
Reso 2003-046
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 4 70% PS&E Submittal <br />Task 4. 1 Review and resolve 30% comments from City <br />Task 4. 2 Identify utility conflicts and process documentation for utility verifications <br />Task 4. 3 Update drainage analysis and drainage talcs <br />Task 4. 4a Prepare typical cross sections plan sheets <br />Task 4. 4b Modify and complete layout sheets <br />Task 4. 4c Prepare Demolition Plan sheets <br />Task 4. 4d Update drainage design <br />Task 4. 4e Develop construction detail plans <br />Task 4. 4f Revise and update grading plan <br />Task 4. 4g Prepare Sound wall grading profile <br />Task 4. 4h Prepare Preliminary SW PPP Plans <br />Task 4. 4i Prepare pavement delineation plan sheets <br />Task 4. 4j Prepare signing plan <br />Task 4. 4k Prepare stage construction and traffic handling plan sheets <br />Task 4. 41 Prepare traffic siganl plan <br />Task 4. 4m Prepare conductor and conduit schedule <br />Task 4. 4n Incorporate construction project details <br />Task 4. 5 Prepare Project Specifications <br />Task 4. 6 Develop Quantities and Update Construction Estimate <br />Task 4. 7 Conduct Independent Quality Control Review <br />Task 4. 8 Prepare Plans,details,calculations for 70% submittal <br />The preparation of relocation plans for utilites not owned by Caltrans or City are excluded in the project scope. <br />Permanent Treatment BMP Measures conforming to Caltrans requirements are excluded from this Scope. <br />It is assumed that there are no structural elements as part of the project with the <br />exception of a new Retaining Wall and reconstructed Sound Wall. <br />Private property restoration work is not included in the scope of work. <br />Project Scope excludes the design of Overhead Sign Structures . <br />Project Scope does not include structural calculations for Traffic Signals. <br />TASK PIC Sr PM PM Eng III Eng II Eng I Cler Tech Surv Tot Hrs Cost <br />Task 4.1 8 12 8 6 34 $4,182 <br />Task 4.2 4 16 32 52 $5,784 <br />Task 4.3 4 12 8 24 $2,596 <br />Task 4.4a 16 12 20 30 16 94 $9,350 <br />Task 4.4b 6 6 6 10 12 40 $3,982 <br />Task 4.4c 12 6 30 62 42 152 $14,318 <br />Task 4.4d 4 2 10 12 10 38 $3,660 <br />Task 4.4e 24 18 58 92 86 278 $26,564 <br />Task 4.4f 4 4 78 24 6 116 $11,118 <br />Task 4.4g 4 8 32 12 16 72 $7,012 <br />Task 4.4h 4 28 10 30 8 80 $7,836 <br />Task 4.4i 4 6 24 12 12 58 $5,642 <br />Task 4.4j 4 10 22 10 12 58 $5,714 <br />Task 4.4k 4 12 26 42 18 48 150 $15,118 <br />Task 4.41 3 10 52 74 15 52 206 $20,763 <br />Task 4.4m 2 4 30 40 8 28 112 $11,290 <br />Task 4.4n 4 10 12 6 32 $3,066 <br />Task 4.5 2 30 14 10 8 10 74 $7,792 <br />Task 4.6 10 12 20 78 64 184 $17,174 <br />Task 4.7 24 12 36 $5,352 <br />Task 4.8 2 8 4 4 18 $2 056 <br />Subtotal 49 12 192 254 526 443 10 422 0 1908 $190,369 <br />Page 19 of 38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.