Laserfiche WebLink
Task 1.1 Supplemental Surveys and Mapping <br />The Contractor shall perform the field surveys to provide detailed information for design <br />purposes if necessary, to supplement the topographic base mapping, which will be provided by <br />the City: <br />• Cross-section existing roadway surface. Maximum 25' intervals. <br />• Provide conform grades for the roadway and back of walk with private properties. <br />• Locate surface utilities. <br />• Provide drainage information including inverts and pipe sizes. <br />• Establish construction control. <br />Task 1.2 Right-of-Way Engineering <br />Right of way engineering has been completed by the City. Proposed right of way limits are to be <br />included in the base mapping files supplied by the City. Determination of right-of-way cost <br />impacts and estimates will be by others. <br />Task 1.3 Existing Utility Information <br />Contractor will contact and obtain utility information, including maps from the utility companies with <br />facilities within the project limits. Based on the utility company maps, City-supplied base mapping <br />and the field surveyed surface utility features, the Contractor will develop a composite master utility <br />file, which will be incorporated into the topographic mapping. The Contractor will coordinate the <br />conformation of the accuracy of these utilities shown on the topographic map with the various utility <br />agencies. <br />The City has begun the process of obtaining approval of the grade crossing modifications from <br />CPUC and has also initiated contact with the various utility companies on relocations that the <br />project requires. The Contractor will include information received from the railroad and utility <br />companies in the contract plans, but the responsibility for design rests with the railroad and the <br />utility companies. The Contractor will assist the City in obtaining design approval from the <br />CPUC. <br />Task 1.4 Miscellaneous Data Collection <br />The Contractor will collect all relevant plans, traffic data, electronic files and reports from the <br />City and others for use in developing base plans. <br />Public agencies and private companies identified by the Contractor and the City as being located <br />within the project limits will be notified by the Contractor that the design phase of the project has <br />begun. The City will send a letter, location map, project schedule and preliminary roadway layout <br />plans generated in the conceptual layout phase to the identified agencies. The recipients of the <br />letter will be asked to verify that the location of their facilities as shown on the layout plans is <br />correct. Confirmations, when received from the agencies and companies, will be included on the <br />base mapping. <br />Exhibit A Page 2 of 13 <br />STIP Marina Widening <br />