Laserfiche WebLink
"'r <br />15~ PROFESSIONAL SEAL. Where applicable in the determination of the contract <br />administrator, the first page of a techaucal report, first page of design specifications, and each <br />page of construction drawings shall be stamped/sealed and signed by the licensed professional <br />responsible for the report/design preparation. The stamp/seal shall be in a block entitled "Seal <br />and Signature of Registered Professional with report/design responsibility" as per sample below. <br />Seal and Signature of Registered Professional with <br />1. report/design responsibility <br />G;\Contracts\Nelson Nygaard CSA 2-19-02 <br />Page 7 of 7 <br />