My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2002 John Cahalan Landscape Architects
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2002
>
Agmt 2002 John Cahalan Landscape Architects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2009 4:58:07 PM
Creation date
8/21/2009 11:17:13 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
3/4/2002
Retention
PERM
Document Relationships
Reso 2002-029
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11. GOVERNMENTAL REGt1LATIONS. To the extent that this Agreement may be funded <br />by fiscal assistance from another governmental entity, Contractor shall comply with all <br />applicable rules and regulations to which City is bound by the terms of such fiscal assistance <br />program. <br />12. DOCUMENTS. All reports, data, maps, models, charts, studies, surveys, photographs, <br />memoranda or other written documents or materials prepared by Contractor pursuant to this <br />Agreement shall become the property of City upon completion of the work to be performed <br />hereunder or upon termination of the Agreement. <br />13. COMPLIANCE WITH APPLICABLE LAWS. Contractor shall comply with all laws <br />applicable to the performance of the work hereunder, including, but not limited to, laws <br />prohibiting discrimination based on race, religious creed, color, national origin, ancestry, <br />physical handicap, medical condition, marital status or sex. <br />14. USE OF RECYCLED PRODUCTS. Contractors shall prepare and submit all reports, <br />written studies and other printed material on recycled paper to the extent it is available at equal <br />or less cost than virgin paper. <br />1 ~. PROFESSIONAL SEAL. Where applicable in the determination of the contract <br />administrator, the first page of a technical report, first page of design specifications, and each <br />page of construction drawings shall be stamped/sealed and signed by the licensed professional <br />responsible for the report/design preparation. The stamp/seal shall be in a block entitled "Seal <br />and Signature of Registered Professional with report/design responsibility" as per sample below. <br />Seal and Signature of Registered professional with <br />report/design responsibility <br />Exhibit D Page 6 of 6 <br />6/l2/95 rev. Washington Manor Middle School Playtields <br />ii30/97 rev. <br />
The URL can be used to link to this page
Your browser does not support the video tag.