My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2002 Alameda County Congestion Management Agency ACCMA
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2002
>
Agmt 2002 Alameda County Congestion Management Agency ACCMA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2009 5:06:24 PM
Creation date
8/21/2009 12:02:44 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
3/18/2002
Retention
PERM
Document Relationships
Reso 2002-036
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ 4 <br />_t <br />Date <br />PROJECT MONITORING FORM 4 <br />Arterial Management Projects <br />TFCA Project # <br />Project Title: <br />Contact: <br />Phone: <br />TFCA $ Expended: $ <br />Project Start Date: <br />E-mail: <br />Total Project Cost: $ <br />Completion Date: <br />Complete the section that applies to the type of project implemented. Use additional sheets as needed. <br />1. Arterial Signal Timing Projects: Use a separate reporting form for each road segment and period <br />(e.g. 7 - 10 am) affected by the project. Provide information for both directions of traffic (e.g. N & S) using a <br />separate line for each direction. Measure vehicle speed and traffic volume concurrently. The before project data <br />shall be gathered within 3 months prior to construction and reported on Lines 1 and 2. The initial post-project <br />data shall be gathered within 1 month after project completion and reported on Lines 3 and 4. The 2-year post <br />project data shall be gathered 23 to 25 months after the construction of the project and reported on Lines 5 and <br />6. Attach a map showing location(s) of re-timed traffic signals. <br />Arterial/Segment: <br />Length (nearest 0.1 mi.) ~ Period: <br /> 'Data Collection Direction of . <br />Traffic Days/Year <br />Effective Traffic Volume in <br />Period Average Vehicle <br />Seed for Period <br />1. Before Project <br />2. Before Project <br />3. Post-Project <br />4. Post-Project <br />5. 2-yrs Post-Project <br />6. 2-yrs Past-Project <br />2. Transit Bus Traffic Signal Prioritization Projects: Provide the following information, using a separate <br />column for each bus route that benefited from the project. The post-project survey should be performed 12 <br />months after completion of the project improvements using an Air District approved ridership survey to <br />determine the number of new riders who previously drove alone. <br />Route number (Use a separate column for each route) Rte Rte Rte <br />Distance of bus route (one way) <br />Days per year of service <br /># Runs per day (one-way} with and without project <br />Average bus speed with and without project <br />Average passengers per run with and without project <br />~ <br />~ <br />1 <br />~ <br />~ <br />~ <br />~ <br />~ <br />~ <br />Average change in ridership on route over past 3 yrs. <br />Number of new riders who previously drove alone <br />Attach map showing location(s) of traffic signals where transit signal prioritization systems were installed. Indicate <br />where other improvements were made to the arterial to improve transit speeds (e.g. bus bulbs, queue lanes). <br />BAAQMD TFCA Funding Application for Program Managers rage o <br />Project Sponsor: <br />
The URL can be used to link to this page
Your browser does not support the video tag.