Laserfiche WebLink
., <br />SAN LEANDRO ADMIlVISTRATRATIVE CODE <br />TITLE 6 FINANCE <br />Chapter 4 Fees <br />2002-03 <br />Proposed <br />§ 6.4.100: FEES. The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code (SLMC), San Leandro Administrative <br />Code (SLAG) or the general laws of the State of California. <br />Descri tion Current Fee Reference 2002-03 Pro ased Chan es <br /> <br />COMMUNITY DEVELOPMENT DEPARTMENT - Buildin~Regulations Division <br />Transformers and balance coils, when not embodied in $ .85 up to a maximum of $80.00 for any one bank 1 to 20 $17.00 <br />or included with apparatus for which fee is herein - 21 to 50 42.50 <br />specifically prescribed: rated for each rated kVA and ' 51 to 80 68.00 <br />fraction thereof 81 and above 80.00 <br />Rectifiers merc arc vibratin and electrol c <br />( ury ~ g yti ). for <br />$ .85 up to a maximum of $80.00 for any one unit <br />1 to 20 <br />$17.00 <br />each kW or kVA and fraction thereof 21 to 50 42.50 <br /> 51 to 80 68.00 <br /> 81 and above 80.00 <br />=For inspection of alterations and changes in existing $ 22.00 ~ '. <br />:wiring, each inspection visit <br />_.- _ ._._.... _._ ___.___. _ __ <br />.__.__.__.. ~ ._._______..W_.__~ .. __~.._..~.._.__._ <br />__~: _ ._ _....__.______ -______.~._ <br />____..._._._...- _ <br />Energy Conservation: review ofplans and/or energy 'Direct Cost (1) with a minimum charge of $48.00 <br />foams for all buildings subject to the California Energy <br />i Commission's conservation regulations (when not <br />covered by building permit) <br />4. Plumbing Perrriit $ 22.00 plus the amount shown for each plumbing item <br /> involved in the worn as shown below <br /> <br />Minimum Fee <br />_ _ ~_____~_ <br />$48.0 <br />0 plus each item, as shown below <br />- -.. _ _ - _ _ ~__._ ,_ . _ _ .. _._ <br /> <br />_ <br />nip pe <br />Exe tion: Ins ction of the installation of an No minimum plumbing permit fee <br />earthquake gas shutoffvalve <br />Phunbing fixture or waste discharge, each <br />-- - __. _ $ 8.75 <br />__ <br /> <br />Plumbing fixture_removed and opening sealed, each ~ <br />_._ _-- ....._ <br />$ 5.00 _._- r _ _._._ <br />Plumbing fixture reset or set after the completion of the _ $ 6.50 <br />structure to an outlet rou ed m rior thereto each <br />,.. ~. _~_~. __..~_~ _~_._.._ ._.~ __.__rP__~ ~ _ _. _ <br />(1) :Direct Costs: Hourly personnel charge plus a factor of 32 9% for bene, fits, 1480% for indarect overhead chimes and 52.23% for staff su~~ort charges, _ _ _ __ _ <br />02/27/02 11 Exhibit A <br />