My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2002 Shutts_Peter G AIA (2)
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2002
>
Agmt 2002 Shutts_Peter G AIA (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2009 5:09:01 PM
Creation date
8/21/2009 1:22:25 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
4/1/2002
Retention
PERM
Document Relationships
Reso 2002-043
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Pro<~ress sets will he required for all construction documents; including 30°~~ and 70io In-ogress <br />sets for internal city review, a 90°ro pro~~ress submittal I~or 6uildin~, department plan check <br />review, and a 100°o construction document submittal for project biddin~~ and award that <br />addresses all necessary permit /plan check requirements. <br />Consultant Tasks <br />• Attend bi-weekly project desi~~n meetin~~s at the San Leandro City Hall <br />• Attend and make presentations at public meetin~~s as needed. <br />• Review the existing, structure and proposed impro~~ements for contormance with the California <br />B~uldin~~ Code, Title 24 r~DA accessibility-, and alb other applicable code requirements. <br />• Retain the services of do si~~n consultants as ne cessar~~ t<~ pro~~idc a complete and accurate et of <br />COI1StrUCUOn documents. <br />~.It~" ~ i1S~~S: <br />• Atte11C~ and IIrran',e ~Or neCCSSarV SItC' V'l~llti <br />Provide title reports for both propci-ties <br />• Complete and submit permit application li>rms <br />• Pro~~ide facility data and ether information as a~~ailable <br />3.0 SCI[EDULC: <br />~1 he due date for completion of the: abo~~c sere-ices and deliverables is as lollo~~~s: <br />Deliverable Schedule Notes <br />30% progress set of constriction Five (4) weeks after Plans for internal City review and <br />drawings floor plans approved. comment. <br />70% progress set of construction Nine (9) weeks after Construction documents to incorporate <br />documents; including drawings, floor plans approved. comments from 30% review. Plans for <br />technical specifications, furniture plan, internal City review and comment. <br />and construction cost opinion. <br />90% pro~~ress set of construction Four (4) weeks after Construction documents to incorporate <br />documents: including, drawin~~s, receipt of~City review comments from 70°ro review and be <br />technical specifications, furniture plan, comments ready for plan check submittal. <br />and construction cost opinion <br />100% progress set of construction Three. (3) weeks after Construction documents to incorporate <br />documents; including drawings, receipt of plan check all plan check comments and be ready <br />technical specifications, furniture plan, comments. for permit issuance and project bidding <br />and construction cost opinion and construction. <br />Exhibit A Page 2 of 2 <br />6/12/9 3201324 WesC Estudillo Building Renovation <br />
The URL can be used to link to this page
Your browser does not support the video tag.