My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2002 Harris Design
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2002
>
Agmt 2002 Harris Design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 1:43:01 PM
Creation date
8/21/2009 1:43:00 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
4/15/2002
Retention
PERM
Document Relationships
Reso 2002-051
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'! <br />Site dimensions <br />Noise levels on the site due to exterior sources <br />1.04b Soil Analysis <br />Several samples of on-site topsoil will be gathered for testing by Soil and Plant <br />Laboratory of Santa Glara. An analysis xeport will be obtained with <br />recommendations for improvement of soil structure and chemistry. <br />1.04c Noise Analysis <br />A preliminary acoustical analysis will be performed. Existing noise levels on the <br />site will be determined based on field measurements. Potential sound attenuation <br />methods will be presented, along with an analysis of the estimated sound <br />reduction that would be achieved with each method. A brief written summary <br />report will be provided. These subconsultant services will be provided by Charles <br />M. Salter Associates. <br />1.04d Lighting Analysis <br />The existing site lighting (athletic fields, parking lots, and-pedestrian lighting) will <br />be inventoried and analyzed. The analysis will provide information on the <br />condition and coverage of the existing lights. Qptions for replacement and/or <br />upgrades will be provided. This analysis will be based on record data provided by <br />the City and/or School District, and also on a site reconnaissance in which the <br />existing electrical systeims will be inspected to the extent that access is provided. <br />1.05 Distribute Site Analysis diagram to Committee Members <br />1.06 Committee Meeting #1 <br />A meeting with the Committee to establish project goals and objectives will be <br />facilitated. The consultant will facilitate the meeting to determine what level of <br />consensus exists among the City and School District representatives. Issues of <br />concern will be identified. Common goals and objectives will be defined. <br />Common priorities will be outlined, as well as outstanding issues of disagreement <br />to be resolved through the planning process. The planning process and project <br />schedule will be reviewed with the committee to determine if any adjustments are <br />desired. <br />Bxhibit A <br />6/1 Z/95 <br />page 2 of 4 <br />Burrel] Field Reconfiguration Study <br />
The URL can be used to link to this page
Your browser does not support the video tag.