Laserfiche WebLink
~~ Zoning <br />Classification <br />1. What is the current zoning classification of the site? > Professional <br />2. Will the site have to be rezoned to build the project? Yes ^ No <br />Variance or Waiver <br />3. Will a zoning variance or waiver be needed to build the project? Yes ® No ^ <br />4. If so, list the date the variance or waiver has been or will be granted? > 05/02/02 <br />IDatel <br />Permits & Fees <br />Permit & Fees Identification <br />Provide a list of any site permits or fees that have been or will need to be obtained: <br />Permit or Fee <br />5. >Building Permit <br />6. >Plumbing and Mechanical Permit <br />7. >Electrical Permit <br />8. >Demolition Permit <br />Cost of Permit or Fee <br />T no ~ en <br />$ 509 <br />$ 546 <br />$1,500 <br />Date Obtained or <br />will be Obtained <br />July 2003 <br />July 2003 <br />July 2003 <br />July 2003 <br />Drainage <br />9. Is the site in the 100-Year Flood Plain? Yes ^ No <br />10. Do any watercourses that require control drain onto the site? Yes ^ No <br />11. Do any watercourses that require control drain off the site? Yes ^ No <br />12. Is the storm sewer system currently adequate to prevent localized flooding of the site? Yes ® No ^ <br />Describe any necessary mitigation measures regarding drainage. <br />There are no mitigating measures regarding drainage. <br />17 <br />