Laserfiche WebLink
Multipurpose Project Budget (With Library Project Budget) (MulGpurposeProjectsOnl~ <br /> ff there are no costs in any line item below for the project; specify by putting a zero "0" in the blank space provided. <br /> A B C D E <br /> Library' Library Portion Library Library Otherz <br />Line Items: Dedicated of Common Total Total Total <br /> Eligible Eligible Eligible Ineligible Ineli ible <br /> truction <br />C <br />N $ $ ~ ~ ~ <br />1. ons <br />ew <br /> $ g S S S <br />2. Remodeling Construction <br /> S S S ~ S <br />3. Contingency <br /> s ~ $ $ a <br />4. Appraised Value of Building <br />5 raised Value of Land <br />A ~ ~ $ ~ $ <br />. pp <br />6 ment <br />Site Develo $ $ $ ~ ~ <br />. p <br /> liti <br />i $ $ ~ $ ~ <br />7. on <br />te Demo <br />S <br /> ~ ~ ~ ~ ~ <br />8. Site Permits & Fees <br /> S g ~ 3 ~ <br />9. Site Option Agreement <br /> ~ $ $ ~ ~ <br />10. Furnishings & Equipment Costs <br />11. Signage $ ~ $ $ ~ <br /> F <br />i <br />i $ ~ $ ~ ~ <br />12. ees <br />ng <br />neer <br />Architectural & Eng <br /> timator Fees <br />C <br />t E <br />ti <br />C <br />t $ $ $ ~ $ <br />13. on <br />os <br />s <br />ruc <br />ons <br />14 ner Fees <br />Desi <br />ri <br />I <br />t $ ~ ~ ~ $ <br />. g <br />e <br />or <br />n <br /> t <br />d R $ ~ $ $ $ <br />15. s <br />epor <br />Geotechnical/Geohazar <br /> Consultant Fees <br />i <br />l <br />M <br />t <br />d $ ~ ~ $ ~ <br />16. a <br />a <br />er <br />s <br />ous <br />Hazar <br />17. Energy Audit, Structural, ADA, & ~ $ $ $ $ <br /> Engineering Feasibility Studies <br />18 Consultant Fees <br />Lib ~ $ ~ $ $ <br />. rary <br /> ement <br />/Project Mana <br />ti <br />t <br />C ~ $ $ $ $ <br />19. g <br />on <br />ons <br />ruc <br /> g 5 S S S <br /> ional Fees <br />f <br />P <br />Oth <br />20. er <br />ro <br />ess <br /> S S ~ S 3 <br />21. Local Project Administration Costs <br /> S S S S S <br />22. Works of Art <br /> $ $ $ ~ 3 <br />23. Relocation Costs & Moving Costs <br /> i <br />l <br />M $ ~ $ 3 ~ <br />24. a <br />s <br />ater <br />Acquisition of Library <br />25. Other (Specify): $ $ ~ $ ~ <br />26. Total Project Costs: $~ ~~ ~~ ~~ $~ <br />~ Library means that portion of the project that provides space for the delivery and support of public library direct services, including joint use school <br />library services (co-location or joint venture). <br />2 "t)ther" uses means any other space that does not provide for the delivery and support of public library direct services. <br />27 <br />