Laserfiche WebLink
<br /> <br />(d) During construction activities, Subdivider shall provide traffic controls per the traffic control <br />plan and as approved by the City Engineer. <br />(e) Subdivider agrees to take all steps necessary to mitigate the potential generation of air-borne <br />dust or debris during the performance of the work hereunder. Subdivider further agrees that the City <br />Engineer, as the sole and final judge, may order all or any portion of the work to be suspended in the event <br />air-borne dust or debris leaves the work area and causes a nuisance to adjoining property owners or the <br />public at large. Such suspensions shall remain in effect until the City Engineer is fully satisfied that the <br />work practices causing the air-borne dust or have been satisfactorily mitigated and the adversely affected <br />properties or areas have been thoroughly cleaned. <br />(f) Construction activity shall not commence prior to 7:00 a.m. and shall cease by 5:00 pm., <br />on weekdays, and shall not commence prior to 8:00 a.m. and shall cease by 5:00 p.m. on Saturdays, unless <br />otherwise approved by the Director of Planning and Building. Prior to working on Saturday the <br />Subdivider's Contractor shall inform the Engineering Inspector 48 hours advance to schedule an inspection. <br />There shall be no construction activity on Sundays. <br />(g) Truck hauling activities shall be-restricted to 8 a.m. - 5 p.m. There shall be no truck <br />hauling activity on Sundays. <br />(h) The contractor shall be required to employ the quietest among alternative equipment or to <br />muffle/control noise from available equipment. <br />(i) Insofar as possible, noisy operations shall be performed off-site or on portions of the site <br />distant from residential neighborhoods. <br />(j) All construction contracts shall include the following requirements: 1) Unpaved <br />construction sites shall be sprinkled with water at least twice per day, 2) trucks hauling construction <br />materials shall be covered with tarpaulins or other effective covers, 3) streets surrounding demolition and <br />construction sites shall be swept at least once per day, and 4) paving and planting shall be done as soon as <br />possible. City shall charge applicant, and applicant shall pay, for all costs of sweeping city streets in the <br />vicinity of the project as necessary to control dust and spillage. <br />TR.aeT MaP ~~93 <br />SUBDIVISION IMPROVEMENT AGREEMENT (PUBLIC IMPROVEMENT) <br />\~ES\SYS\USER\ENGINEER\_LD\_Maps\VTM 7293\SUBIMPI.AGR.doc <br />PAGE 14 OF 16 <br />