Table 1
<br />.1~
<br />PROPOSED LATIP 1N PRIORITY ORDER -Revised June 17, 2008
<br />Central Alameda Connty Freeway Study
<br />
<br />ID
<br />Fac10h'
<br />Locatlon
<br />ite6pons~blt :lgrncy
<br />Intpruvemcn[ Namr
<br />L,ucaNUU Tofal Paritl#ng Nirdtd (20117 ` tea
<br /> dullard
<br />1 - Caltrans Land Disposition Fees - TBD Actual amount unknown, $10 million used N calculations.
<br /> Total funding needed reflecLS difference bchvecn project cost
<br />2 - Hayward Hayward 238/Foothi6-Mission - S3Q060,000 and committed funding. Also subject to pending legislative
<br /> change.
<br />3 4580 Castro Valley ACTA I-580/Redwood Road Interchange Redwood Rd. 53,000,000 Total funding needed is a contingencies allowance for potential
<br /> unforscen construction itcau-
<br /> I-880
<br />4 I-238 TBD Locations to be determined Sound Walls 510,000,006
<br /> I-530
<br />
<br />I I-880 Adaptive Ramp Metering
<br />and I-238 h
<br />/ACCMA
<br />C ICM 500
<br />000
<br />532
<br /> a
<br />rans ,
<br />,
<br />J I-580 Integrated Corridor Management (ICM) Program
<br />
<br />D
<br />1-880
<br />Hayward
<br />Cal[rans/ACCMA I-880 Auxiliary Lanes, Paseo Grande to
<br />West A Street interchange to Winton Interchange
<br />532,500,000
<br /> Winton Avenue
<br />F 1-880 Hayward Caltraas/ACCMA 1-880 Auxiliary Lanes, Whipple Road to Whipple Road to Industrial Parkway West 519,506,006
<br /> Industrial Parkway West
<br />- I-880 County and San Leandro Callrans/ACCMA HOV Project Development - $10,000,000 Funds to Prepazc PSR
<br /> (Projects A, B, and C)
<br /> Ofihe Cour interchange projects, R, E, K, and L, Project R, a
<br /> 1-880/Route 92 Reliever - Clswifer/Whitesell Measure B project, will be implemenfcd lust provided it is
<br />R Hwy 92 Hayward Haywazd SR 92/Clawitor [nterchange Area S52,000,000
<br /> In(erchange sufFciently ready to proceed al the Time funding becomes
<br /> available.
<br />E 1-880 Halnvard Hayrvard/ACCMA I-860 /Industrial Parklvay Wcsl Interchange Industrial Parkway West Interchange $41,000,000
<br /> Total funding nceded was reduced to reflect the construction
<br />K I-880 San Leandro San Leandro I-880 /Davrs Street Interchange Davis SL 511,100,000 coal for structure reconstruction to 6e borne by the
<br /> southbound HOV Project (I-Bon<i).
<br /> Total funding needed was reduced to reflect the construction
<br />L 1-880 San Leandro San Leandro/ACCMA I-880 /Marina Boulevard Interchange Marina BLvd. 524,400,000 cost for structure reconstmction to be borne by the
<br /> southbound HOV Project (I-Bond),
<br />G I-880 Union Ciry TBD 4880 /Whipple Road Interchange Whipple Road 513,500,000
<br />M I-880 Hayward TBD f-880/West A Street Interchange W. A St- 52'7,000,000
<br />N I-880 Ha}nvard TBD 7-880/Wesf Winton Avenue Interchange Winton Ave. 525,000,000
<br />O SR 92 Hayward TBD Route 92/Industrial Boulevard [nterchange Industrial Btvd. S6,OOQ606
<br />P 7-580 County TBD I-580/Slrobridge OIf--Ramp Modification I-580/S trobridge Avenue/Castro Valley Boulevard 521,000,000
<br /> Caltrans/ACCMA C.1-North oC Washington Tota1155,500
<br />000
<br />
<br />C
<br />I
<br />880
<br />C
<br />d S
<br />[
<br />d Extend Northbound I-880 High Occupancy ,
<br />4 Costs represent extension to north of Davis. An additional
<br /> - ounty an
<br />an
<br />-ean
<br />ro
<br />Vehicle (HOV) Lanes
<br />C.2- South of Washington ,006,600
<br />C.1 6
<br />$52,000,000 N 2007 dollars u requQCd to go to Hegenberger.
<br /> Cal[ans/ACCMA
<br />(Southern limit is north of Hacienda) C.Z 91,500,000
<br />
<br />A ]-238 San I-eandro Caltrans/ACCMA NB 423g coonecwr to NB I-880 I-238 [nterchange [~rovements 531,000,000
<br />
<br />d I-238 connector to NB 1-880
<br />(1~ )
<br />If Projects A and B are coastnrcted concurrently, the total cost
<br />an
<br />B
<br />` will be 546,200,000. This figure was used m bottom Ime sum
<br /> I-880 San Leandro altrans/ACCMA
<br />C Washington Interchange WashingtonR-860 Interchange S3t,000,000
<br /> TOTAL COST OF ALL PROJECTS: E570,200,000
<br />