Laserfiche WebLink
Table 1 <br />.1~ <br />PROPOSED LATIP 1N PRIORITY ORDER -Revised June 17, 2008 <br />Central Alameda Connty Freeway Study <br /> <br />ID <br />Fac10h' <br />Locatlon <br />ite6pons~blt :lgrncy <br />Intpruvemcn[ Namr <br />L,ucaNUU Tofal Paritl#ng Nirdtd (20117 ` tea <br /> dullard <br />1 - Caltrans Land Disposition Fees - TBD Actual amount unknown, $10 million used N calculations. <br /> Total funding needed reflecLS difference bchvecn project cost <br />2 - Hayward Hayward 238/Foothi6-Mission - S3Q060,000 and committed funding. Also subject to pending legislative <br /> change. <br />3 4580 Castro Valley ACTA I-580/Redwood Road Interchange Redwood Rd. 53,000,000 Total funding needed is a contingencies allowance for potential <br /> unforscen construction itcau- <br /> I-880 <br />4 I-238 TBD Locations to be determined Sound Walls 510,000,006 <br /> I-530 <br /> <br />I I-880 Adaptive Ramp Metering <br />and I-238 h <br />/ACCMA <br />C ICM 500 <br />000 <br />532 <br /> a <br />rans , <br />, <br />J I-580 Integrated Corridor Management (ICM) Program <br /> <br />D <br />1-880 <br />Hayward <br />Cal[rans/ACCMA I-880 Auxiliary Lanes, Paseo Grande to <br />West A Street interchange to Winton Interchange <br />532,500,000 <br /> Winton Avenue <br />F 1-880 Hayward Caltraas/ACCMA 1-880 Auxiliary Lanes, Whipple Road to Whipple Road to Industrial Parkway West 519,506,006 <br /> Industrial Parkway West <br />- I-880 County and San Leandro Callrans/ACCMA HOV Project Development - $10,000,000 Funds to Prepazc PSR <br /> (Projects A, B, and C) <br /> Ofihe Cour interchange projects, R, E, K, and L, Project R, a <br /> 1-880/Route 92 Reliever - Clswifer/Whitesell Measure B project, will be implemenfcd lust provided it is <br />R Hwy 92 Hayward Haywazd SR 92/Clawitor [nterchange Area S52,000,000 <br /> In(erchange sufFciently ready to proceed al the Time funding becomes <br /> available. <br />E 1-880 Halnvard Hayrvard/ACCMA I-860 /Industrial Parklvay Wcsl Interchange Industrial Parkway West Interchange $41,000,000 <br /> Total funding nceded was reduced to reflect the construction <br />K I-880 San Leandro San Leandro I-880 /Davrs Street Interchange Davis SL 511,100,000 coal for structure reconstruction to 6e borne by the <br /> southbound HOV Project (I-Bon<i). <br /> Total funding needed was reduced to reflect the construction <br />L 1-880 San Leandro San Leandro/ACCMA I-880 /Marina Boulevard Interchange Marina BLvd. 524,400,000 cost for structure reconstmction to be borne by the <br /> southbound HOV Project (I-Bond), <br />G I-880 Union Ciry TBD 4880 /Whipple Road Interchange Whipple Road 513,500,000 <br />M I-880 Hayward TBD f-880/West A Street Interchange W. A St- 52'7,000,000 <br />N I-880 Ha}nvard TBD 7-880/Wesf Winton Avenue Interchange Winton Ave. 525,000,000 <br />O SR 92 Hayward TBD Route 92/Industrial Boulevard [nterchange Industrial Btvd. S6,OOQ606 <br />P 7-580 County TBD I-580/Slrobridge OIf--Ramp Modification I-580/S trobridge Avenue/Castro Valley Boulevard 521,000,000 <br /> Caltrans/ACCMA C.1-North oC Washington Tota1155,500 <br />000 <br /> <br />C <br />I <br />880 <br />C <br />d S <br />[ <br />d Extend Northbound I-880 High Occupancy , <br />4 Costs represent extension to north of Davis. An additional <br /> - ounty an <br />an <br />-ean <br />ro <br />Vehicle (HOV) Lanes <br />C.2- South of Washington ,006,600 <br />C.1 6 <br />$52,000,000 N 2007 dollars u requQCd to go to Hegenberger. <br /> Cal[ans/ACCMA <br />(Southern limit is north of Hacienda) C.Z 91,500,000 <br /> <br />A ]-238 San I-eandro Caltrans/ACCMA NB 423g coonecwr to NB I-880 I-238 [nterchange [~rovements 531,000,000 <br /> <br />d I-238 connector to NB 1-880 <br />(1~ ) <br />If Projects A and B are coastnrcted concurrently, the total cost <br />an <br />B <br />` will be 546,200,000. This figure was used m bottom Ime sum <br /> I-880 San Leandro altrans/ACCMA <br />C Washington Interchange WashingtonR-860 Interchange S3t,000,000 <br /> TOTAL COST OF ALL PROJECTS: E570,200,000 <br /> <br />