My WebLink
|
Help
|
About
|
Sign Out
Home
FacilitiesTransportation Highlights 2009 0916
CityHall
>
City Clerk
>
City Council
>
Committees
>
Facilities & Transportation Committee
>
FacilitiesTransportation Highlights 2009 0916
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2009 10:04:10 AM
Creation date
10/16/2009 10:04:09 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Committee Highlights
Document Date (6)
9/16/2009
Retention
PERM
Document Relationships
_CC Agenda 2009 1019
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2009\Packet 2009 1019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9/16/2009 <br />Program Costs <br />• Report Project Cost - $56.5M <br />• Includes a 25% design contingency <br />• No construction management or construction <br />contingencies <br />• Total Construction - $46.8M to $58.6M <br />• Cost reduced based on planned Value Engineering <br />reductions during final design <br />• Costs include construction contingency (15%), <br />construction management (8 %), and special inspection <br />and testing (3 %) <br />• Range based on a 0 to 25 % range in design contingency <br />• No estimation of construction cost savings based on <br />bidding climate <br />Schedule <br />a Schedule <br />® Property Acquisition <br />^ Site preparation 7/ 09 to 8/ 10 <br />® Evaluation Phase 8/ 09 <br />^ Construction Documents 9/09 to 9/10 <br />^ Bidding and Contracts 11/10 - 3/11 <br />^ Construction 2011-2013 <br />^ Some components will be separated for early <br />completion <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.