Laserfiche WebLink
November 9, 2009 <br />Section 7: Implementation <br />The final prioritization score is a summation of the score for each criteria, with a maximum <br />potential score of nine. <br />7.2 Results of the Cost-Benefit Analysis <br />The below four tables summarize the high level results of the cost-benefit analysis and assist in <br />developing the prioritization of actions to assist the City of San Leandro to achieve ifs <br />greenhouse gas emissions target. For more details, see Appendix C. <br />Table 5. Building Energy Use Actions <br /> GHG Cost Feasibility Total <br />Proposed Measure Score Score Score Score <br />Goal: Irrtpr~nve.,energy efFlclenc3y-gtrd reduce costs of +~ner~y upgrades ifa~r t~skl~~tt {~toi~errtles~ <br />JJ <br />Offer home performance classes by building staff 2 3 3 8 <br />Develop a revolving loan fund for home <br />performance audits and improvements 2 2 3 7 <br />Adopt a Residential Energy Conservation Ordinance <br />RECD 3 2 1 6 <br />Adopt athird-party or municipal financing program <br />for residential enerc,~y efficiencyretrofits 2 2 2 6 <br /> <br />Goal: Improve ar-ergy efflcieacy and reduce costs at energy upgrades fir caimmarciai( end . <br />Industrlaf properties <br />Require "beyond compliance" for new Commercial <br />and Industrial construction (e.g. by 10%) 3 3 1 7 <br />Adopt a Commercial Energy Conservation <br />Ordinance (CECO) 3 2 1 6 <br />Gt~al: Increase residsntlal, commercial, and industrial renewable energy u$eT~ `^ ~- `~ <br />Adopt athird-party or municipal financing program <br />for renewable energy systems 2 2 2 6 <br />~~ Gast: Promote green bulldirFg practices in both the new construction and remodel market <br />Encourage green building operations, e.g. LEED- <br />EBOM, Commercial Checklist 1 3 3 7 <br />Mandatory green building ordinance for private new <br />construction 3 2 1 6 <br />a <br />R.+ o <br />Page 54 <br /> <br />