Laserfiche WebLink
CAPITAL IMPROVEMENT PROGRAM <br />Complete Projects List <br />TF 19 2004.0170 LS R Macarthur Boulevard Phase 2 X 2006 1,100 <br />PSB Communication Room <br />IJOD 20 2006.0040 JK B Expansion x 2006 300 <br />Beatrice - Washington Av <br />MG 21 2006.0100 UU R Interchange Additional funding x 2006 227 227 <br />Washington Manor Park <br />MG 22 2003.0170 CK P Playground Renovation X 2006 860 <br />Town Hall Square Davis/East <br />14th Intersection Improvements <br />Construction (formerly Downtown <br />TF 23 2004.0260 LS R Development Project) X 2006 334 <br />Siempre Verde Park - <br />2 <br />MG <br />24 2005.0050 CK P Playground Equipment X <br />2006 <br />675 <br />1-880 / Davis St Overcrossing <br />C7 <br />TF <br />25 2006.0020 UU R Design x <br />2006 <br />679 <br />o <br />Misc Traffic Safety Improvements <br />Q <br />MS <br />26 2004.0330 UU TR (annual) <br />2006 <br />` c <br />rn <br />San Leandro Ball Park Drainage <br />E <br />TF <br />27 2003.0600 MB P Project X <br />2006 <br />290 <br />E <br />N <br />2 <br />3 <br />o <br />0 <br />d <br />❑ <br />c <br />LL <br />M c <br />E c <br />Project <br />y <br />- <br />w <br />u <br />n <br />c <br />m <br />o <br />$ <br />c <br />a <br />C7 <br />rn <br />'n <br />Z d <br />c <br />A <br />E <br />c <br />N <br />' <br />V- <br />0 <br />N <br />m <br />m <br />3 <br />C <br />0 <br />N <br />M <br />Cn <br />1n <br />:9 <br />W <br />Ol <br />y <br />.d.. <br />O <br />m <br />d <br />, <br />d <br />p <br />' <br />CL <br />C <br />Y 01 QJ <br />c o o Q <br />gym„ <br />C <br />0 <br />m <br />J <br />`m <br />C <br />a <br />o <br />0 <br />O <br />0 <br />0 <br />0 1c <br />A <br />m <br />c <br />v <br />c <br />N <br />m <br />N <br />m <br />m <br />Q <br />Q <br />v� <br />U S <br />0- <br />U <br />`m <br />Q <br />Q U o <br />Q <br />d a <br />m <br />C <br />W <br />m <br />T <br />u <br />r/1 <br />o <br />N <br />0 <br />N <br />0 <br />N <br />0 o <br />N N r2 <br />m <br />0 <br />o <br />m <br />a <br />Z <br />a <br />Z <br />a <br />❑ <br />tr <br />❑ <br />LL <br />❑ <br />(L <br />❑ LL r <br />H r w <br />NT <br />17 2003.0100 DB B <br />Mulford Manna Library <br />X <br />2006 <br />5,300 <br />16 <br />PWS Maintenance Projects <br />TF <br />18 2005.0150 MB R <br />Various Location (annual) <br />2006 <br />50 <br />TF 19 2004.0170 LS R Macarthur Boulevard Phase 2 X 2006 1,100 <br />PSB Communication Room <br />IJOD 20 2006.0040 JK B Expansion x 2006 300 <br />Beatrice - Washington Av <br />MG 21 2006.0100 UU R Interchange Additional funding x 2006 227 227 <br />Washington Manor Park <br />MG 22 2003.0170 CK P Playground Renovation X 2006 860 <br />Town Hall Square Davis/East <br />14th Intersection Improvements <br />Construction (formerly Downtown <br />TF 23 2004.0260 LS R Development Project) X 2006 334 <br />JOD 28 2003.0910 UU P Slough Ped/Bike Bridge X 2006 3,053 <br />1 <br />IMS 29 2006.0030 MB R Davis St Sidewalk Repair x 2006 100 100 <br />MG 30 2003.0050 CK P Farrelly Pool Refurbishment X 2006 1,850 <br />San Leandro Ball Park <br />MS 31 2003.0330 MB P Locker/Restroom Refurbishment X 2006 130 <br />32 2004.0210 CK B Senior Center X <br />I <br />679 <br />100 <br />50 <br />Siempre Verde Park - <br />2 <br />MG <br />24 2005.0050 CK P Playground Equipment X <br />2006 <br />675 <br />1-880 / Davis St Overcrossing <br />C7 <br />TF <br />25 2006.0020 UU R Design x <br />2006 <br />679 <br />o <br />Misc Traffic Safety Improvements <br />Q <br />MS <br />26 2004.0330 UU TR (annual) <br />2006 <br />50 50 <br />rn <br />San Leandro Ball Park Drainage <br />TF <br />27 2003.0600 MB P Project X <br />2006 <br />290 <br />JOD 28 2003.0910 UU P Slough Ped/Bike Bridge X 2006 3,053 <br />1 <br />IMS 29 2006.0030 MB R Davis St Sidewalk Repair x 2006 100 100 <br />MG 30 2003.0050 CK P Farrelly Pool Refurbishment X 2006 1,850 <br />San Leandro Ball Park <br />MS 31 2003.0330 MB P Locker/Restroom Refurbishment X 2006 130 <br />32 2004.0210 CK B Senior Center X <br />I <br />679 <br />100 <br />50 <br />m Y t E <br />U 7 all O U F <br />657 <br />Devel <br />227 oper <br />Escro <br />w from <br />SL <br />Hospit <br />995 al <br />1 <br />DRAFT <br />Summary Description <br />This project will replace the existing branch library with a larger facility <br />featuring more seating, improved technology and increased book <br />collections. $2,542,674 was requested in the 2004 Library grant <br />submittal <br />Fund to complete mid sized repair projects $20,000 to $50,000 range <br />from a list maintained by E/T and PWS <br />Project implements the recommendations of the Streetscape Master <br />Plan and the completed design for enhancing the appearance of the <br />street and installing traffic calming measures. Phase 2 improvements <br />are between Lewis Avenue to Dutton Ave. <br />Expand the existing communications room into the computer <br />room to accommodate additional communications stations and <br />a bathroom <br />Additional funding for the ACTIA 11 project for inprovements at <br />the Washington Ave Fargo intersection in the ammount of <br />$226,916 provided by Greenhouse Marketplace <br />This project will replace play equipment to meet ADA standards and <br />install new curbing and surfacing. <br />In support of the redevelopment of the area bounded by Davis St, <br />Hays St, and E 14th Street. Construct required street widening of <br />Daivs St and East 14th St and the closure of Hays Street <br />Replace the playground equipment and renovate the picnic area at <br />Siempre Verde Park with new equipment that provided play value and <br />meets current code requirements. Renovate the picnic area to <br />modernize and make more attractive. <br />SafeTea-Lu grant for the design of a new interchange Est. of <br />design cost was $11M <br />Installation of traffic safety equipment such as audible signals, <br />guardrails, and other items to improve traffic safety <br />This project includes installation of a drainage system throughout the <br />outfield area of the softball field. <br />Constructs a pedestrian / bike bridge to expand the Bay Trail <br />connecting Oyster Point to the trail. Design completed in February <br />2005. <br />Repair or replace sidewalk, pavers, tree wells and trees if <br />necessary to repair damaged walks between E14th St and SLB <br />This project will complete necessary code improvements to pool <br />facility as detailed in the Facility Evaluation by Aquatic Design Group <br />(January, 2002). <br />Refurbish and upgrade the restrooms and locker rooms at the City's <br />ball park. <br />This project will prepare construction documents and contruct facilities <br />based on the schematic design of a dedicated Senior Center that <br />ncludes a computer room, and a multi-purpose room or large <br />auditorium, an arts and crafts room, a theater -style room for showing <br />movies and having presentations and several classrooms and other <br />amenities consistent with the conceptual design completed in the <br />2002-03 fiscal year. 2006-2007 Demolition, North Parking demo and <br />Reconstruct, signal on E14th, Monument and Landscaping $656,753 <br />CDBG $995,200 From ecrow acct with Hospital, <br />2006_07 CIPProgram 4_20_06 Finance Committee.xls Page 2 of 7 4/20/2006 <br />N <br />2 <br />O <br />C <br />W <br />d <br />j0 <br />LL <br />C7 <br />C <br />C <br />2 <br />o <br />Q <br />E <br />a <br />rn <br />,n d <br />o <br />c <br />'v <br />mV <br />u <br />0 <br />d <br />❑ <br />m <br />E <br />LL <br />m Y t E <br />U 7 all O U F <br />657 <br />Devel <br />227 oper <br />Escro <br />w from <br />SL <br />Hospit <br />995 al <br />1 <br />DRAFT <br />Summary Description <br />This project will replace the existing branch library with a larger facility <br />featuring more seating, improved technology and increased book <br />collections. $2,542,674 was requested in the 2004 Library grant <br />submittal <br />Fund to complete mid sized repair projects $20,000 to $50,000 range <br />from a list maintained by E/T and PWS <br />Project implements the recommendations of the Streetscape Master <br />Plan and the completed design for enhancing the appearance of the <br />street and installing traffic calming measures. Phase 2 improvements <br />are between Lewis Avenue to Dutton Ave. <br />Expand the existing communications room into the computer <br />room to accommodate additional communications stations and <br />a bathroom <br />Additional funding for the ACTIA 11 project for inprovements at <br />the Washington Ave Fargo intersection in the ammount of <br />$226,916 provided by Greenhouse Marketplace <br />This project will replace play equipment to meet ADA standards and <br />install new curbing and surfacing. <br />In support of the redevelopment of the area bounded by Davis St, <br />Hays St, and E 14th Street. Construct required street widening of <br />Daivs St and East 14th St and the closure of Hays Street <br />Replace the playground equipment and renovate the picnic area at <br />Siempre Verde Park with new equipment that provided play value and <br />meets current code requirements. Renovate the picnic area to <br />modernize and make more attractive. <br />SafeTea-Lu grant for the design of a new interchange Est. of <br />design cost was $11M <br />Installation of traffic safety equipment such as audible signals, <br />guardrails, and other items to improve traffic safety <br />This project includes installation of a drainage system throughout the <br />outfield area of the softball field. <br />Constructs a pedestrian / bike bridge to expand the Bay Trail <br />connecting Oyster Point to the trail. Design completed in February <br />2005. <br />Repair or replace sidewalk, pavers, tree wells and trees if <br />necessary to repair damaged walks between E14th St and SLB <br />This project will complete necessary code improvements to pool <br />facility as detailed in the Facility Evaluation by Aquatic Design Group <br />(January, 2002). <br />Refurbish and upgrade the restrooms and locker rooms at the City's <br />ball park. <br />This project will prepare construction documents and contruct facilities <br />based on the schematic design of a dedicated Senior Center that <br />ncludes a computer room, and a multi-purpose room or large <br />auditorium, an arts and crafts room, a theater -style room for showing <br />movies and having presentations and several classrooms and other <br />amenities consistent with the conceptual design completed in the <br />2002-03 fiscal year. 2006-2007 Demolition, North Parking demo and <br />Reconstruct, signal on E14th, Monument and Landscaping $656,753 <br />CDBG $995,200 From ecrow acct with Hospital, <br />2006_07 CIPProgram 4_20_06 Finance Committee.xls Page 2 of 7 4/20/2006 <br />