Laserfiche WebLink
Annual Overlay Rehabilitation <br />MS 1 2003.0020 UU R Program X 2006 1,000 800 <br />MS 2 2003.0030 UU R Annual Street Sealing Program X 2006 200 200 <br />Additional Street Rehabilitation <br />AO 4 2003.0090 UU R TCR X 2006 272 530 <br />Annual Sidewalk Replacement <br />TF 6 2005.0130 UU R Program 2006 340 100 <br />Waste Water Treatment Plant <br />INT 8 2003.1250 MB SC Improvements 2006 3,500 2,500 <br />JOD 11 2006.0090 HH M Marina Area Land Use Study x 2006 226 175 <br />Shoreline Riprap Construction <br />14 2006.0110 MB M (annual) x 2006 100 100 <br />CAPITAL IMPROVEMENT PROGRAM <br />2006 / 2007 Projects List <br />Fiber Optic Communication to <br />� <br />NT <br />`m <br />C <br />c <br />120 <br />120 <br />E <br />E <br />°a <br />o <br />Project at <br />u <br />c <br />w <br />°' rn <br />Z <br />a` <br />A <br />E <br />w <br />O <br />`' <br />0M <br />LL <br />ar <br />c <br />m <br />t:i <br />c c <br />u <br />u <br />c <br />m <br />u <br />C <br />L <br />A <br />J C O O o <br />m o m CD w <br />E <br />Q x, <br />o <br />a <br />p a <br />a <br />r1 <br />C <br />W <br />0 U a 0 0 <br />N N N N N <br />Annual Overlay Rehabilitation <br />MS 1 2003.0020 UU R Program X 2006 1,000 800 <br />MS 2 2003.0030 UU R Annual Street Sealing Program X 2006 200 200 <br />Additional Street Rehabilitation <br />AO 4 2003.0090 UU R TCR X 2006 272 530 <br />Annual Sidewalk Replacement <br />TF 6 2005.0130 UU R Program 2006 340 100 <br />Waste Water Treatment Plant <br />INT 8 2003.1250 MB SC Improvements 2006 3,500 2,500 <br />JOD 11 2006.0090 HH M Marina Area Land Use Study x 2006 226 175 <br />Shoreline Riprap Construction <br />14 2006.0110 MB M (annual) x 2006 100 100 <br />CAPITAL IMPROVEMENT PROGRAM <br />2006 / 2007 Projects List <br />800 <br />200 <br />Beatrice - Washington Av <br />MG 21 2006.0100 UU R Interchange Additional funding x 2006 227 227 <br />Misc Traffic Safety Improvements <br />MS 26 2004.0330 UU TR (annual) 2006 50 50 50 <br />29 2006.0030 MB R Davis St Sidewalk Repair x 2006 100 100 1 100 <br />NT 32 2004.0210 CK B Senior Center X 2006 14,891 2,110 791 158 <br />Pedestrian Accessability <br />TF 39 2005.0160 UU R Improvements 2006 79 79 <br />Fiber Optic Communication to <br />NT <br />40 2006.0130 MB C WPCP <br />x 2006 <br />120 <br />120 <br />Annual Neighborhood Traffic <br />w <br />43 2003.0500 UU TR Calming X <br />2006 <br />o <br />rn o <br />O <br />N N <br />E <br />C <br />M <br />c <br />c <br />m <br />rL <br />O <br />`' <br />0M <br />LL <br />ar <br />c <br />m <br />t:i <br />N <br />v <br />c <br />o <br />m <br />m <br />of <br />m <br />a <br />u <br />_ <br />m <br />d <br />of <br />m <br />m <br />0 <br />; <br />Q <br />o <br />X <br />° <br />o <br />C <br />Q <br />o <br />a' <br />N <br />m <br />LL <br />a <br />N <br />a <br />U <br />a <br />x <br />c <br />�j <br />a <br />O <br />Q <br />o <br />U <br />~ <br />0) <br />01 <br />c <br />o <br />w <br />m <br />v <br />' <br />o <br />Er <br />C <br />_ <br />c <br />E <br />CL <br />01 <br />'� <br />a <br />01 <br />O <br />.�. <br />E <br />E <br />0 <br />800 <br />200 <br />Beatrice - Washington Av <br />MG 21 2006.0100 UU R Interchange Additional funding x 2006 227 227 <br />Misc Traffic Safety Improvements <br />MS 26 2004.0330 UU TR (annual) 2006 50 50 50 <br />29 2006.0030 MB R Davis St Sidewalk Repair x 2006 100 100 1 100 <br />NT 32 2004.0210 CK B Senior Center X 2006 14,891 2,110 791 158 <br />Pedestrian Accessability <br />TF 39 2005.0160 UU R Improvements 2006 79 79 <br />2,500 <br />120 <br />79 <br />175 <br />50 <br />657 <br />530 TCR <br />010-31- <br />006 <br />Gen <br />100 Fund <br />Heron <br />Bay <br />Asses <br />sment <br />100 Dist <br />Devel <br />227 oper <br />Escro <br />w from <br />SL <br />Hospit <br />995 al <br />DRAFT <br />Q <br />m <br />v Summary Description <br />c <br />LL <br />_. 1 <br />0 <br />r <br />habilitation by reconstruction or overlay of streets based on field <br />pection, Pavement Management System condition and proximity to <br />er related projects. <br />nual cape and slurry sealing program based on inspection and <br />vement Management System priority list. <br />vides for additional street rehabilitation from Traffic Congestion <br />lief Funds provided by the State <br />Annual program to replace damaged or resident requested sidewalks <br />10C and driveways (To be included in Operations) <br />Implement a variety of improvements developed by the current facility <br />2,500 testing and improvement study. See WPCP spreadsheet for details <br />Overall study and preparation of a planning document for the <br />175 possible reuse of the Marina Area <br />As part of the Heron Bay Assessment District Maintenance Area <br />Annual allocation for repair and construction of banks along the <br />Shoreline Trail and areas south from the Neptune Drive Bridge to <br />10 the San Lorenzo Creek <br />Additional funding for the ACTIA 11 project for inprovements at <br />the Washington Ave Fargo intersection in the ammount of <br />22 $226,916 provided by Greenhouse Marketplace <br />Installation of traffic safety equipment such as audible signals, <br />5G guardrails, and other items to improve traffic safety <br />Repair or replace sidewalk, pavers, tree wells and trees if <br />100 necessary to repair damaged walks between E14th St and SLB <br />This project will prepare construction documents and contruct facilities <br />based on the schematic design of a dedicated Senior Center that <br />includes a computer room, and a multi-purpose room or large <br />auditorium, an arts and crafts room, a theater -style room for showing <br />movies and having presentations and several classrooms and other <br />amenities consistent with the conceptual design completed in the <br />2002-03 fiscal year. 2006-2007 Demolition, North Parking demo and <br />Reconstruct, signal on E14th, Monument and Landscaping $656,753 <br />2,11 CDBG $995,200 From ecrow acct with Hospital, <br />Construct pedestrian ramps, ADA improvements and sidewalk gap <br />closures in various locations in the City that meet Transportation <br />Development Act (TDA) Article 3 requirements (GRANT amount <br />7 ($79,724) <br />Connect WPCP to fiber optic network Install 24 strand fiber in <br />existing conduit from Doolittle Dr to the WPCP front gate. Run <br />fiber either overhead or underground to plant communication <br />120 room to connect to network server. <br />Annual funding to design and construct temporary and permanent <br />neighborhood traffic calming devices, including speed humps, traffic <br />100 circles, chicanes, one-way entrances/exits, and median closures <br />Annual allocation for riprap repairs at the Marina and study of long <br />5C term repair solutions for the deteriorating articulated block mat. <br />Annual allocation for specialized traffic engineering studies including <br />501speed surveys for arterials and collector streets. <br />2006_07 CIPProgram 4_20_06 Finance Committee.As Page 1 of 2 4/20/2006 <br />Fiber Optic Communication to <br />NT <br />40 2006.0130 MB C WPCP <br />x 2006 <br />120 <br />120 <br />Annual Neighborhood Traffic <br />TF <br />43 2003.0500 UU TR Calming X <br />2006 <br />100 <br />100 <br />100 <br />JOD <br />50 2003.0650 MB M Riprap Improvements/Repairs X <br />2006 <br />50 <br />50 <br />Miscellaneous Traffic <br />TF <br />52 2004.0030 UU TR Engineering Studies annual <br />2005 <br />50 <br />50 1 <br />50 <br />2,500 <br />120 <br />79 <br />175 <br />50 <br />657 <br />530 TCR <br />010-31- <br />006 <br />Gen <br />100 Fund <br />Heron <br />Bay <br />Asses <br />sment <br />100 Dist <br />Devel <br />227 oper <br />Escro <br />w from <br />SL <br />Hospit <br />995 al <br />DRAFT <br />Q <br />m <br />v Summary Description <br />c <br />LL <br />_. 1 <br />0 <br />r <br />habilitation by reconstruction or overlay of streets based on field <br />pection, Pavement Management System condition and proximity to <br />er related projects. <br />nual cape and slurry sealing program based on inspection and <br />vement Management System priority list. <br />vides for additional street rehabilitation from Traffic Congestion <br />lief Funds provided by the State <br />Annual program to replace damaged or resident requested sidewalks <br />10C and driveways (To be included in Operations) <br />Implement a variety of improvements developed by the current facility <br />2,500 testing and improvement study. See WPCP spreadsheet for details <br />Overall study and preparation of a planning document for the <br />175 possible reuse of the Marina Area <br />As part of the Heron Bay Assessment District Maintenance Area <br />Annual allocation for repair and construction of banks along the <br />Shoreline Trail and areas south from the Neptune Drive Bridge to <br />10 the San Lorenzo Creek <br />Additional funding for the ACTIA 11 project for inprovements at <br />the Washington Ave Fargo intersection in the ammount of <br />22 $226,916 provided by Greenhouse Marketplace <br />Installation of traffic safety equipment such as audible signals, <br />5G guardrails, and other items to improve traffic safety <br />Repair or replace sidewalk, pavers, tree wells and trees if <br />100 necessary to repair damaged walks between E14th St and SLB <br />This project will prepare construction documents and contruct facilities <br />based on the schematic design of a dedicated Senior Center that <br />includes a computer room, and a multi-purpose room or large <br />auditorium, an arts and crafts room, a theater -style room for showing <br />movies and having presentations and several classrooms and other <br />amenities consistent with the conceptual design completed in the <br />2002-03 fiscal year. 2006-2007 Demolition, North Parking demo and <br />Reconstruct, signal on E14th, Monument and Landscaping $656,753 <br />2,11 CDBG $995,200 From ecrow acct with Hospital, <br />Construct pedestrian ramps, ADA improvements and sidewalk gap <br />closures in various locations in the City that meet Transportation <br />Development Act (TDA) Article 3 requirements (GRANT amount <br />7 ($79,724) <br />Connect WPCP to fiber optic network Install 24 strand fiber in <br />existing conduit from Doolittle Dr to the WPCP front gate. Run <br />fiber either overhead or underground to plant communication <br />120 room to connect to network server. <br />Annual funding to design and construct temporary and permanent <br />neighborhood traffic calming devices, including speed humps, traffic <br />100 circles, chicanes, one-way entrances/exits, and median closures <br />Annual allocation for riprap repairs at the Marina and study of long <br />5C term repair solutions for the deteriorating articulated block mat. <br />Annual allocation for specialized traffic engineering studies including <br />501speed surveys for arterials and collector streets. <br />2006_07 CIPProgram 4_20_06 Finance Committee.As Page 1 of 2 4/20/2006 <br />