Laserfiche WebLink
11/10/2009 <br />Marina Channel Dredging <br />• Description: Channel dredging and storage of <br />dredged materials in the DMMS <br />• Work contracted by US Army Corp of <br />Engineers <br />• Schedule: Completion in December 2009 <br />Bay Trail Shoreline Riprap Repairs <br />Description: Repair of damaged shoreline within <br />FEMA's approval <br />Schedule: Completion in December 2009 <br />~.; <br />,. <br />Long Beach Before Condition Long Beach in Construction <br />8 <br />