My WebLink
|
Help
|
About
|
Sign Out
Home
Inst 2009364340
CityHall
>
City Clerk
>
City Council
>
Recorded Documents
>
2009
>
Inst 2009364340
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2009 3:38:49 PM
Creation date
12/7/2009 3:37:21 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
10/5/2009
Recorded Document Type
Historic Preservation
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br />Future preservation, maintenance, and rehabilitation projects proposed for completion at the <br />Mayor Gill Residence from 2010 through 2020,over the initial 10-year Mills Act Contract period <br />are identified on the table below. Proposed or possible multi-year phasing for major projects <br />such as wall cladding (shingles) installation and window replacements are further detailed on <br />two following tables. <br />Projects Proposed in 2010-2020, <br />Project Description Location Completion Project Cost <br /> Year <br />Install period-appropriate wrought iron hand railing at House Exterior - By 2013 3,000. <br />orch Porch <br />Remove three layers of existing non-historic roofing; House -Roofline By 2012 19,700. <br />examine sheathing and reuse if possible; install new (2009 est.) <br />downspouts and ridge (3) and eyebrow (6) vents; <br />secure chimne brace; install new roofin <br />Repairs to fascia, knee braces, wood work details House -Roofline By 2015 Unknown <br /> Value <br />Shingle cladding repairs -all elevations House Exterior *Phased 44,515. <br /> Multi-Year* <br />Exterior trim paint House Exterior- By 2015 12,000. <br /> 2~a floor and <br /> roofline <br />Remove existing roofing material; install single-ply Tank House By 2016 2,300. <br />roof system (2009 <br /> estimate <br />Repairs to fascia, knee braces, wood work details Tank House - By 2018 Unknown <br /> Roofline Value <br />Repairs to fascia, knee braces, wood work details Garage - By 2018 Unknown <br /> Roofline Value <br />Shingle cladding repairs -all elevations Tank House *Phased 15,800. <br /> Exterior Multi-Year* (2009 <br /> estimate <br />Shingle cladding repairs -all elevations Garage Phased 6,960. <br /> Multi-Year (2009 <br /> estimate <br />Basement Window Replacement House Exterior - Phased 4,000. <br />(4 period-appropriate windows) West (3) & East Multi-Year (2009 <br /> 1 elevations Estimate <br />15t Floor Window Replacements House Exterior - Phased 9,000. <br />(9 period-appropriate windows) Perimeter Multi-Year (2009 <br /> estimate <br />2~d Floor Window Replacements House Exterior - Phased 15,000. <br />(15period-appropriate windows) Perimeter Multi-Year (2009 <br /> estimate <br />Install raised planter bed with drip system in back Exterior 2021 Unknown <br />ard; install additional back and avers Landsca e Value <br />Install wood fencing around front yard Exterior -Along 2020 10,000. <br /> front and west (2009 <br /> side of ro ert estimate <br />Replace gravel driveway with pavers Exterior 2022 Unknown <br /> Landsca e Value <br />Anticipated Cumulative 2010-2020 Projects Total Cost: $142,275. <br />Mills Act Contract - Exhibit A October 5, 2009 <br />558 Joaquin Avenue Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.