My WebLink
|
Help
|
About
|
Sign Out
Home
10A Action 2010 0201
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2010
>
Packet 2010 0201
>
10A Action 2010 0201
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2010 9:52:32 AM
Creation date
1/28/2010 9:52:31 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
2/1/2010
Retention
PERM
Document Relationships
_CC Agenda 2010 0201
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2010\Packet 2010 0201
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Office of Senator DianneFeinstein <br />Fiscal Year 2010 Appropriations Request Form <br />Submit by Febntary 5, 6:OOPM Eastern Tune <br />Requesting EntitX: City of San Leandro <br />Requesting Individual: Mayor Tony Santos <br />Priorit 2 of 3 requests <br />Project Name: Public Safety Building Expansion <br />Amount Requested: $3,000,000 <br />Bill: <br />A enc <br />Account: <br />Project Justification (4 sentences; 150 word limit): The communication center of the San <br />Leandro Police Department must be expanded to provide services to the citizens and police <br />officers now and in the future. Expanding technology, workspace ergonomics, accessibility, and <br />the increased staffing required to handle cellular 911 calls are a few of the critical reasons that a <br />new communication center is badly needed. Currently, cellular 911 calls are received at a local <br />Highway Patrol dispatch center before being re-routed to San Leandro. The City is seeking <br />federal funding assistance to will construct a 1,050 square foot addition to the existing Public <br />Safety Building for housing the communication center on the first floor, and add 1,050 square <br />feet of floor space to the second floor for other police functions. <br />Description of the Project (no limitj: The current Public Safety Building houses the City Police <br />Dispatch and Communication Center. Constructed in the 1960's, the 460 square foot floor plan was <br />originally designed for radio equipment, not the dual screen computer consoles and other <br />communications equipment utilized by today's police dispatchers. The San Leandro Public Safety <br />Building contains the communication center for the Police Department. Service demands, <br />including the answering and processing of cellular 911 calls, require that the center <br />accommodate additional dispatchers. New equipment, including seven work stations and the <br />floor space to effectively use the equipment cannot be accommodated in the existing facility. <br />Due to communication center's 24/7 responsibilities, expanding the existing space in place is not <br />a viable alternative. <br />The City is seeking federal funding assistance to construct a new communication center as an <br />expansion of the existing building away from the current center. The improvements would <br />include construction of a 1,050 square foot expansion on the ground floor for use as the <br />communication center with the required heating and air conditioning and electrical upgrades to <br />serve the new equipment. The additional second floor space will provide needed space to the <br />Investigation Section. <br />Follow enclosed Instructions. Include Additional Information required for Defense Requests <br />U. S. Senator Dianne Feinstein 1 FYIO Appropriations <br />
The URL can be used to link to this page
Your browser does not support the video tag.