Laserfiche WebLink
San Leandro Quarterly Report <br />10/26/2009 <br />R/O Unit ALCO Identifer Date Labor OT Labor Parts Frei ht OSR Tax R/O total Re Hrs OT Hrs eason for re a Work erformed <br /> Excessive smoke from exhaust. Found turbo <br /> oil seal on exhaust side had failed and also <br /> oil in fuel.9 <br /> Replace bad turbo.^ <br /> Reseal all injectors.^ <br />09064 207 T12 09/11/09 $ 1,237.50 $ 412.50 $1,512.67 $137.10 $ 19.84 $ 147.49 $ 3,467.10 16.5 5.5 Repair Change fuel filters and drain fuel/oil mixture <br /> from tank and refill with fresh fuef.^ <br /> <br /> Replace damaged aerial control door on tiller <br /> and grab handle on cab. Damage caused by <br /> ack knife of trailer. <br />09054 212 T9 09/01/09 $ 75.00 $ - $ 75.00 1.0 0.0 Re air Ad usted tiller door links e <br /> <br />09058 <br />212 <br />T9 <br />09/01/09 <br />$ 112.50 <br />$ - <br />$ i 12.50 <br />1.5 <br />0.0 <br />817 inspection 90 day safety inspectiong <br /> Ri has air teak over the ri ht down 45 si <br /> Installed new labels in cab and tiller cab to <br /> identify new switches. Q <br />09053 212 T9 09/02/09 $ 75.00 $ - $ 1.26 $ - $ 0.12 $ 76.38 1.0 0.0 Repair Repaired left tiller door; won't open from <br /> outside. Replaced clip on latch connection <br /> rod. <br />Total for Quarter $18,095.78 <br />G:\ADMIN\FINANCIAL\Finance Team1FY 2009-10\Quarteriy AllocalloMFire\Jul-Sep Q1 WpparaWs Reports\San Leandro puarterly_Jul-Sep 09 Date Punted: 70!26/2003 4:37 PM <br />