My WebLink
|
Help
|
About
|
Sign Out
Home
Ord 2010-001
CityHall
>
City Clerk
>
City Council
>
Ordinances
>
2010
>
Ord 2010-001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2010 10:12:24 AM
Creation date
2/8/2010 10:07:11 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Ordinance
Document Date (6)
2/1/2010
Retention
PERM
Document Relationships
_CC Agenda 2010 0201
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2010\Packet 2010 0201
8B Consent 2010 0201
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2010\Packet 2010 0201
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Adopted 7/16/2001 -Effective 811 512 0 0 1 City of San Leandro Zoning Code -Article 19 <br />(includes amendments effective through 2007) <br />this article; <br />m. Contain the following statement: "I have complied with the <br />criteria of Article 19 of the Zoning Code, including ali design <br />standards of Section 4-1908, and applied them for the efficient <br />use of water in the landscape design plan"; and <br />n. Bear the signature of a licensed landscape architect, licensed <br />landscape contractor or any other person authorized to design <br />a landscape. <br />3. Irrigation Design Plan submitted in an applicant's Landscape <br />Documentation Package shall include: <br />a. Location and size of separate water meters for landscape; <br />b. Location, type and size of all components of the irrigation <br />system, including controllers, main and lateral lines, valves, <br />sprinkler heads moisture sensing devices, rain switches, quick <br />couplers, pressure regulators, and backflow prevention <br />devices; <br />c. Static water pressure at the point of connection to the public <br />water supply; <br />d. Flow rate (gallons per minute), application rate (inches per <br />hour), and design operating pressure (pressure per square <br />inch) for each station; <br />e. Recycled water irri anon systems (if applicable); <br />f. Demonstration of compliance with all design standards <br />specified in the article; <br />g. The following statement: "I have complied with the criteria of <br />Article 19 of the Zoning Code, including all design standards <br />and applied them accordingly for the efficient use of water in <br />the irrigation design plan"; and <br />h. The signature of a licensed landscape architect, certified <br />irrigation designer, licensed landscape contractor, or any other <br />person authorized to design an irrigation system. <br />4. Water Management Plan submitted in an applicant's Landscape <br />Documentation Package shall include: <br />a. An introduction and statement of existing site conditions, <br />including annual precipitation rates; <br />b. The anticipated water requirements in inches per year for each <br />h~drozone; <br />c. Seasonal irrigation water schedules or procedures for_ <br />programming proposed controllers; .and <br />d. A maintenance plan for the ongoing operation and maintenance <br />of the irrigation system. <br />AR.19 <br />Page 4 of 19~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.