Laserfiche WebLink
Adopted 7116/2001 - F~fective 811 512 0 0 1 City of San Leandro Zoning Code -Article 19 <br />(includes amendments effective through 2007) <br />1. management actions be identified to remediate limiting soil <br />characteristics such as ripping the soil to alleviate sail <br />compaction. <br />6. Grading Design Plan submitted in an applicant's Landscape. <br />Documentation Package shall include: <br />a. Height of graded slopes; <br />b. Drainage .patterns; <br />c. Pad elevations; <br />d. Finish grade; <br />e. Stormwater retention improvements, if applicable; <br />This requirement may be fulfilled by providing the aforementioned <br />information on the Landscape Design Plan. <br />C.~ Irrigation is Required. ~'~^°^+.n., inn~° fnrvrily rJ°v°Innm°n+ ~A permanent <br />.,,.,.r......,., <br />and automatic irrigation system that complies with all design standards <br />specified in this article shall be provided for all new and renovated <br />landscaped areas exceeding five hundred (500) square feet except <br />residential landscapes that are less than five thousand (5,000) square <br />feet.- The Zoning Enforcement Official may waive this requirement due to <br />significant physical constraints. A statement regarding the provision of an <br />irrigation system shall be made on the final landscape plans. <br />An Irrigation Design Plan shall be submitted as part of the Landscape. <br />Documentation Package (when required) or when ~^r ,~~^° ^^^ r° ,.+°r+,~~ <br />^r^;°^+ ^r ~•,"°^ made a condition of approval-t#e or required by the <br />Zoning Enforcement Official m^~,r-~eg~~~r° +"^+ ^^^''ean~s ^r^~~~^' <br />a~pl+catisl~--When required, the ~~~`inh+inn n~~nlrrigation Design.. Plan shall <br />include the following information: <br />1. Location and size of separate water meters for landscape; <br />2. Location type and size of all components of the irrigation system, <br />including controllers main and lateral lines, valves, sprinkler heads, <br />moisture sensing devices rain switches quick couplers, pressure <br />regulators, and backflow prevention devices; <br />3. Static water pressure at the point of connection to the public water <br />supply; <br />4. Flow rate (gallons per minute) application rate (inches per hour),. and <br />design operating pressure (pressure per square inch) for each station; <br />5. Recycled water irrigation systems (if applicable); <br />6. Demonstration of compliance with all design standards specified in the <br />article; <br />7. The following statement: "I have complied with the criteria of Article 19 <br />AR.19 <br />Page 6 of 19~ <br />