Laserfiche WebLink
No material or equipment shall be stored on City property. Any materials or equipment brought <br />to the site for use during- any one day shall be placed where it will not interfere with the free and <br />safe passage of traffic and pedestrians. Such materials and equipment shall be removed at the <br />end of each day or when maintenance operations are suspended for any reason. <br />If a hazardous condition is observed and the City notifies the Contractor either directly or by <br />telephone, the Contractor shall correct the condition immediately. If the Contractor fails to <br />correct the hazardous condition immediately, the City reserves the right to install or have <br />installed the necessary lights, barricades, etc. The cost involved shall be deducted from any <br />money due or to become due the Contractor. <br />Full compliance with this section shall be considered as included in the contract price paid and <br />no separate payment will be made therefore. <br />Traffic Control <br />The Contractor shall adhere to all Cal-OSHA and Department of Transportation standards and <br />requirements and take all necessary safety precautions to insure that maintenance work does not <br />endanger the health and safety of the public or cause hazards to the safety of landscape <br />maintenance employees. Construction signs, lights, barricades, etc. shall conform to the latest <br />revision of the Manual of Warning_ Si s Lights and Devices For Use In Performance of Work <br />Upon Hi hg ways, by the California Department of Transportation. <br />Traffic lanes shall be kept open at all times except when maintenance work may require <br />temporary closing of the lane immediately adjacent to the work area. At no time shall there be <br />less than one traffic lane open in each direction. The Contractor shall minimize closing of traffic <br />lanes by parking maintenance vehicles for loading and unloading of materials and landscape <br />maintenance equipment in the left hand turn lanes(s) at the beginning of the median taper. <br />Appropriate safety devices such as traffic cones, warning signs, early warning safety directional <br />boards and/or barricades shall still be used as required. <br />Whenever the Contractor's operations create a condition hazardous to traffic or to the public, the <br />Contractor shall, without cost to the City, furnish, erect and maintain such barricades, lights, <br />signs, and other devices and take such other precautions as are necessary to prevent damage or <br />accidents or injury to the public and the Contractor's employees. The Contractor shall also <br />furnish such flagmen as are necessary to give adequate warning to traffic or to the public of any <br />dangerous conditions to the public. All flagging costs shall be born solely by the Contractor. <br />It is the Contractor's responsibility to provide for the safety of traffic and the public. 'This <br />includes responsibility to inspect, and identify conditions that render any portions of the jobsite <br />unsafe. The City shall be notified immediately of any unsafe conditions that requires major <br />correction. The Contractor shall be responsible for making minor corrections, including, but not <br />limited to; filling holes in turf areas and paving, using barricades or traffic cones to alert the <br />public to the existence of hazards, and replacing valve box covers. <br />Pedestrian travel shall be maintained at all times along both sides of all streets or streets where <br />work as part of this contract is being performed. All temporary pedestrian walkways shall be at <br />