My WebLink
|
Help
|
About
|
Sign Out
Home
8D Consent 2010 0405
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2010
>
Packet 2010 0405
>
8D Consent 2010 0405
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2010 4:30:02 PM
Creation date
4/1/2010 4:30:01 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
4/5/2010
Retention
PERM
Document Relationships
_CC Agenda 2010 0405
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2010\Packet 2010 0405
Reso 2010-036
(Reference)
Path:
\City Clerk\City Council\Resolutions\2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SAN LEANDRO <br />STAFF REPORT <br />DATE: April 5, 2010 <br />TO: Stephen L. Hollister, City Manager <br />FROM: Uchenna Udemezue, P.E., Directo <br />Engineering and Transportation De artment <br />BY: Kenneth Joseph, P.E., City Engine r <br />Engineering and Transportation Department <br />SUBJECT/PROJECT DESCRIPTION: <br />APPROVED AND <br />FORWARDED <br />TO CITY COUNCIL <br />~~%6~ <br />Stephen L. Hollister <br />City Manager <br />RESOLUTION OF AWARD OF CONSTRUCTION CONTRACT TO CON-QUEST <br />CONTRACTORS, INC., FOR THE WICKS LIFT STATION AND BLUE DOLPHIN LIFT <br />STATION REHABILITATION PROJECT, PROJECT NO. 08-593-52-243. <br />SUMMARY AND RECOMMENDATION <br />Staff recommends award of contract to the low responsive bidder, Con-Quest Contractors, Inc., <br />in the amount of $771,500 for the subject project. <br />BACKGROUND <br />The Blue Dolphin Lift Station, serving the Marina area's West Dike, was constructed in 1962 and <br />has reached the end of its service life. One of the two pumps failed and the station is operating on a <br />single pump. The station needs to be rehabilitated and the pumps replaced. <br />The Wicks Lift Station was constructed in 1966 as a dry and wet well package system with the <br />pumps and valves located in the dry well, and asurface-mounted control center. The lift station <br />serves local businesses south of the station and pumps flow to the Merced Lift Station located 200 <br />feet away, requiring double handling of the flow. The station has reached the end of its service life <br />as indicated by its increasing unreliability and increased maintenance. <br />On January 19, 2010, the City Council approved the plans and specifications for the rehabilitation of <br />the subject pump stations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.