Laserfiche WebLink
BID SUMMARY <br />~~s~~ ~~ ~ <br />o <br />PROJECT TITLE: Wicks and Blue Dolphin Lift Station Rehabilitation Pro}ect <br />PROJECT NO.: 08-593.62-243 <br />BID NO.: 09-10.013 <br />BID OPENING <br />DATE: Wednesday, March 10, 2010 <br />TIME: 11:00 AM ~ <br />LOCATION: City Clsrk ENGINEER'S ESTIMATE <br />bate Approved: 116/2010 <br />Prepared by: KC Tidelands Construction Co. <br />P. O. Box 607 <br />Brentwood, CA •94513 <br />Phone: 925-516-0600 <br />Fax: 925-516-4802 <br />ITEM <br />N0. QUANTITY ITEM UNIT COST ITEM COST UNIT COST ITEM COST <br />1 1 LS Mobilization $ Demobilization $36,750.00 $36,750.00 $45,000.00 $45,000.00 <br /> (Not to exceed 5% of total <br /> contract) <br />2 1 LS Traffic Control & Construction $10,500.00 $10,500.00 $15,000.00 $15,000.00 <br /> Area Signs <br />3 1 LS Dust Control $10,500.00 $10,500.00 $1,000.00 $1,000.00 <br />4 1 LS Temporary Waste Water $15,750.00 $15,750.00 $55,000.00 $55,000.00 <br /> Bypass-Wicks Lift Station <br />5 1 LS Temporary Waste Water $5,250.00 $5,250.00 $25,000.00 $25,000.00 <br /> Bypass-Blue Dolphin Lift Station <br />6 1,328 LF 10-inch PVC Sanitary Sewer $148.35 $197,008.80 $130.00 $172,640.00 <br /> Forcemain <br />7 110 LF 14-inch Ductile Iron Forcemain $157.50 $17,325.00 ~ $580.00 $83,800.00 <br />8 20 LF 8-inch PVC Sanitary Sewer $136.50 $2,730.00 $200.00 $4,000.00 <br />9 1 EA Permanent 14-inch forcemain $15,750.00 $15,750.00 $6,000.00 $8,000.00 <br /> bypass connection <br />10 3 EA Permanent 10-inch forcemain $12,800.00 $37,800.00 $15,000.00 $45,000.00 <br /> maintenance bypass <br />11 1 LS Wicks Lift Station-compiete in $299,250.00 $299,250.00 $290,000.00 $290,000.00 <br /> place <br />Bid Summary • woks and Blue Dolphin Lift Station Rehab Project.xlsx Page 3 of 4 Printed 3/10/2010 ~ 2:60 PM <br />