i of SBA ~9
<br />ti ZP Ciry of San Leandro
<br />~~ o 835 E. 14"~ Street
<br />~ ,~~ -~,~~ San Leandro CA 94577
<br />Notice of Proposed
<br />Sewer and Wastewater Treatment
<br />Rate Increase and Public Hearing
<br />The City of San Leandro is considering raising rates for sewer/wastewater treatment services, according to the
<br />tables on the back, to fund continued maintenance and operations, as well as seismic repairs and comprehensive
<br />modernization of the wastewater treatment facility.
<br />The San Leandro Water Pollution Control Division operates and maintains sewer lines and the Wastewater Treatment Plant
<br />(Plant}. The Plant has been serving the community since 1939-it is aging and needs to be modernized to meet today's operating
<br />and seismic standards and to continue to comply with California's strict water quality standards.
<br />• The Plant has been in continuous operation for 70 years, 24 • Modernization will ensure the Plant can hold more water
<br />hours a day, and the structures and equipment are nearing during peak hours and allow for steady cleaning of water
<br />the end of their useful lives. during storm conditions, preventing untreated water from
<br />• Making emergenry repairs when equipment fails costs three entering the Bay.
<br />times more than planned replacement. • Modernizing the Plant now will allow the City to take
<br />• Advanced technology is more effective and efficient and advantage of potential federal stimulus grants, historically
<br />will. allow the plant to clean more water every day, while low interest rates, and a favorable construction climate.
<br />meeting even higher clean water standards. • Annual operating costs are about $6 million.
<br />• The Plant currently cleans about twice as many pollutants • The upgrades will cost $37-$46 million.
<br />as other plants of its size.
<br />In accordance with Proposition 218 (Article XIIID of the California Constitution), this notice about the proposed rate increase
<br />is being sent to all property owners served by the Ciry of San Leandro Water Pollution Control Plant (approximately 15,500).
<br />If more than 50% of property owners submit a written protest to the City during the 45-day protest period that runs from
<br />May 5, 2010 to June 21, 2010, the City cannot raise rates. If fewer than 50% of property owners submit a written protest
<br />within that timeframe, the City has the discretion to consider raising sewer/wastewater treatment services up to the amounts
<br />shown in this notice. The proposed rates, if adopted, would be effective afrer July 1, 2010; all increases shown would be
<br />effective as of July 1st of each subsequent year. The rates cannot. exceed the maximum shown in the table nor be raised again
<br />without another written notice to property owners and a Public Hearing.
<br />If you do not agree with the proposed rate increase, you may submit a written protest letter or use the form below and deliver
<br />it in one of three ways:
<br />1. Mail it to the San Leandro City Clerk, Wastewater Rates, 835 E. 14~" Street, San Leandro CA 94577. It must arrive by
<br />5 p.m., June 21, 2010.
<br />2. Hand deliver your letter or the form below to the San Leandro City Clerk at 835 E. 14~'' Street, Room 205, San Leandro
<br />CA 94577, by 7 p.m., June 21, 2010.
<br />3. Bring your letter or the form below to:
<br />City Council Public Hearing
<br />7 p.m. June 21, 2010
<br />San Leandro City Hall
<br />835 E. 14'" Street, Council Chambers, San Leandro CA 94577
<br />In order to be counted as a valid protest against the proposed rate increase, your letter or the form below must include the
<br />Assessor's Parcel Number (on mailing label), the property address, anal an authorized signature, and be delivered as outlined
<br />above. Only one protest is allowed per property.
<br />(continued on back)
<br />---------------------------------------------------------------cut here --------------------------------------------------------------
<br />Protest Form
<br />If you would like to protest the proposed sewer and wastewater treatment rate increase, you may write a letter or complete this form, detach
<br />it, and mail it to the San Leandro City Clerk, Wastewater Rates, 835 E. 14th Street, San. Leandro CA 94577.Or you may hand deliver your
<br />letter or this form to the City's Clerk's office, 835 E. 14th Street, Room 205> San Leandro, CA 94577. In order to be counted as a valid
<br />protest against the proposed rate increase, this form or your letter must include the Assessor's Parcel Nutnber (on mailing label), the property
<br />address, and an authorized signature, and be delivered. to the City Clerk no later than the end of the Public Hearing on June 21, 2010
<br />at 7 p.m. Only one protest is allowed per property.
<br />Assessor's Parcel Number: Parcel Address:
<br />^ I protest the proposed sewer and wastewater treatment rate increase to fund operations,
<br />maintenance, modernization and replacement costs related to providing sewer service to
<br />properties within the San Leandro Water Pollution Control Plant Service area.
<br />I hereby declare under penalty of perjury that I am the owner of the above listed property or the authorized representative of the owner
<br />of the above listed property.
<br />Please print your name
<br />Please sign your name
<br />
|