Laserfiche WebLink
2010 - 2011 Capital Improvement Program Complete List <br />Pra}ect Number ~ a Project ~ m Stoped a ~ ~, ~ ~ ~ ~ ~ ~ ~~ p ~ a ~, I o n. a ~ ~. ~ ~ ~ n ~ ~ Q ~, Comments Summary Description o <br />~`, . <br />N i <br />O r* <br />2008.0162 R 99 Bridge Maintenance and 2010 790 250 $ 0 250 0 Measure 1-B Make repairs to various 7.43 <br />Repair Various Locations city owned bridge <br />structures in conformance <br />with the 2007 Bridge <br />Inspection Report <br />prepared by PWS & ET and <br />State Bridge Report <br />1/24/09. Replaces portion <br />of 2008.0160 Crack seal <br />decks and Monarch Bridge <br />Design /permitting only <br />i <br />2009.0140 B 5 Publie Safety 2009 65,000 0 $$ 0 ~ j ! ~ Replace the existing Public 7.00 <br />Administration Building Safety Building based on <br />Replacement findings of the space <br />analysis and department <br />recommendations Middle <br />alternative used Does not <br />I, included property <br />~ acquisition if required. <br />2003.0480 R 99 RR Crossing Noise 2003 44 0 $ 0 0 This project will eliminate 7.00 <br />Reduction Program or reduce the use of train <br />Automated Horn System horns when trains <br />"L" Line approach a railroad <br />crossing in the City of San <br />Leandro by installing a <br />permanent audible <br />warning device that <br />automatically sounds as <br />the train approaches the <br />railroad crossing. <br />2005.0030 R 6 Marina Spine Construction 2009 1,326 0 $$ 0 0 0 0 0 ~ Construction of the Spine 7.00 <br />~Ped/Bike) component of <br />the Monarch Bay /Fairway <br />Orive Design ronsistent <br />with the Marina <br />~ ~ Connection Plan. <br />Monday, Apri~19, 2010 <br />aintenance Impact Ker <br />- No or Less Maintenance <br />$ < $5,000 per year <br />$$ $5,000 - 525,000 per year <br />$$$ > $25,000 per year <br />Page 2 of 20 <br />