Laserfiche WebLink
2010 - 2011 Capital Improvement Program Complete List <br />Protect Number ~ ~ Pr4leck ~ ~ 5toped o ~ ~ ~ o ~ ~ m . ~ ~~.~ ~ ~ p ~ ~ , ~ ~, ~ ~ ~ ~ ~ ~ <br /> ~ ~ ~ ~ <br /> ~ vii . F-+ ~ d1 C ~ ~ ~,` ~ +-' ~;~,~ rd: ~ : Y.i > fD <br /> frt 7 C ^. W- ~ Ld N w ~ -~Vi i .. ~ '~ N <br /> a ~y1, 1 N ~ Q <br /> a i <br /> N t u ; ~ <br />2004,0280 B 2 South Branch Library 2004 410 0 $$ 0 <br /> Remodel/Renovation <br />2009.0121 P 6 Marina Oog Park (Option 2049 312 312 $$$ 0 <br />1a <br />2005.0040 P 6 Marina Park -Group 2010 988 988 $ 0 <br />Picnic Areas <br />2009,0240 R 99 Annual Sidewalk Repair 2014 120 0 $ <br />Program (annual) <br />0 <br />2008.0190 R 99 Access Ramp Installation 2010 100 0 $ 0 0 <br />(annual <br />Monday, April 19, 2010 <br />0 <br />aintenance Im act Ke <br />- No or Less Maintenance <br />$ <$5,000peryear <br />$$ $5,000 - $25,000 per year <br />$$$ > $25,000 per year <br />', III <br />~~ ~ ~o~ ~o <br /> o ~ '~~Comment5 Summary p~sc'~ption <br /> <br />~ <br />~ W <br />'~ <br />n <br />ta 7 <br />~ ~ ~ ~F' I <br />' ~ ~ ~ ~ ~ <br /> v <br /> p m <br /> '_ _ i .. <br /> Remodel the buildin 6.71 <br />g <br /> exterior including <br /> replacement of the <br /> windows and other <br /> cosmetic enhancements <br /> and renovating the interior <br /> of the branch Iibrary~5l <br /> Library Foundation Design <br /> & Const /Staff time G.F. <br />0 Construct a dog park at the 6.67 <br /> Shoreline Recreation Area <br /> south of the Neptune <br /> Bridge Alternative 1- <br /> Decomposedgranite at <br /> fence line only <br />988 Design and rebuild the 6.67 <br /> three group picnic areas at <br /> Marina Park to provide <br /> shade and a wind barrier. <br /> The existing revenue <br /> generating facilities have <br /> been damaged by age and <br /> dry rot and had to be <br /> partially removed leaving <br /> an attractive nuisance. <br /> Funded allocation Remove and replace 6.57 <br /> through damaged sidewalks and <br /> operational driveways and other <br /> accounts. No CIP concrete work within City <br /> process required right of way based on field <br /> inspections and resident <br /> requests. Includes <br /> administration and <br /> inspection of annum <br /> program. <br /> 0 Install access curb ramps at 6.57 <br /> locations associated with <br /> the budget year street <br /> rehabilitation project. <br />Page 4 of 20 <br />