|
.~,___..~ _......m_..__.._».~. _._.__..,._..~...._»,___.w~~.. _._.___._~.__.,.~.»_»_._._._._.... _._.~__._. .,..__~~.____.___.__.~.~~__._.~._...~..____... _ ~.__,.._.~,._~._...,....~.~...__.__.___~_...~._._._...._
<br />SAN LEANDRO ADMINISTRATIVE CODE w.._,w_...~..... _ FINANCE
<br />TITLE 6 Chapter 4 FEES
<br />...5'4.1 _ ___..__..._~.,____,...__ , ...„__,,.~....,. »», ,_.. _.._,._..__. ..._.......,_ .__....
<br />» .._._.~.. _.__.._ ...___.._.._...~.,...... _.»....._ ....».,...,.._ .......,,~.._. ~.........__..M~ ............ ...~..,. .
<br />§ 00 FEES The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code (SLMC) San Leandro Administrative Code (SLAG) or the general laws of the State of California.
<br />...,..u. ~.~ >~, .....,.,.,.
<br />j ~, ~,~_,"__,mm, m UascnGt un Current Fee 1F.eierence Proposed Fees 2010 2011
<br />COMA9UN17Y DEVELOPMENT pEPARTMLNT - Bulltling Regulations Division
<br />I Fi ,na:: n~:auons .: ,..,.,E
<br />{~!-~ ~ ...~.. nginei,~:uy ~ Trar+siw,rtdt~wi Ueye,tiiKr,t Ilan) !. PuLlw W~rh Pr~le~L+
<br />2':.Buildiny P.=m~it
<br />NOTE. FEES FuR BUILDING PERMITS AND TERMITE REPAIk WORK DO NOT INCLUDE THE STRONG MOTION (EARTHQUAKE) INSTRUMENTATION PROGRAM (S.M.LP.)
<br />_.._.._.
<br />A Ftlmg and Issuance Fee $86 plus valuation fees andtor other budding fees as listed below f87 plus valuation lees andtor other building fees as listed below
<br />Re-fikna Feefor each resubmittal, deferred submittal, andtor revision after the 1st so%of Filing and Issuance Fee per occurcence ;This fee already exists, but is modifed to allow the application of the fee after the 1st
<br />resubmittal for plan check on the same project i S 'resubmittal, or upon the 2nd resubmittal.
<br />Minimum fee for one inspection ~ Ilnduded in the Issue and Fdmg Fee "~»"'~'YA~»»
<br />Budding Permits requiring more than one inspection, other than for those requiring '$131.00 ~ »» »»» ;5132.00
<br />return inspections, for corcections from a~revious inspectionmm have a minimum fee of „ , _ '€
<br />All-Inclusive Permit: Work involving a combination of building andtor mechanical, ,One filing and Issuance fee plus Items from respective fee tables
<br />elecMcal and plumbing, with a value of less than $3,000:
<br />~. ..._. __._,...._.._..,..__.,...».....~....__.,.w.. ._.,....,.._ .................._.... __.._....,,.., ........,..,___._ ,__.....
<br />r Residential Seismic Retrofit projects using "Planset A ;575.00 plus Filing and /ssurance Fee , New ;Flat Fee /or one and two family residential seismic retrofits that use "Planset A"for the woir
<br />e ~ Permits involving plan check, inspections, and verification per OSHPD3 ~ ~~ ~ 125Y. of normal Buidling Permit Fee. Plan check fee shall be i New 'Vert
<br />requirements. j calculated based on this increased fee. ;
<br />~ New Commerclal/Industrial Bmldings 10,000 sq. tt. or more 1125% of standard Bul/ding Permit Fee ~ New iThi:
<br />{ ~ veri
<br />s ~ I 1 €
<br />~ { Tier 1 Certification ~ 13075 of standard Building Permit Fee I New jFee
<br />) Thi
<br />' J veri
<br />a
<br />! ~ ~ l
<br />_.._.».,, _.__ __,_.,... _. .,_...___ -_ _....._» ..m_..._. _
<br />Tier2Cerification ~._...., ....,.»,,, __.,___ ____...__ ....,._,,,.~._ _..,_.....
<br />135•/. o/standard Building Permit Fee -) New ~ Fee
<br />p I ~ ~Thi
<br />veri
<br />._.~__i_» ' e .. _
<br />(Note: The Building Official may adjust the plan checking/permilf~e for an individual project when costs to the Cdy are not congruent with this fee schedule.)
<br />~. ., ~..,.,,».w»„»~„~<.,.»,.».,,.,a..~~ ,,.m=,.,~„~.m,.~,,.µ.~»,m..~...,..,,-~,...>~..,,.~,,.~ , ».n,.,m,nix,,-~.,»»~.»,gym.».»„w,,..,w,~..,,.,,,~M~.,. w._N,....,.,,...,,."<.%,~,..»~..
<br />Tptal Valuation (Based on bW value of all construction work, as detemdrled by Ore Building
<br />fNficial, including all firdsh work, roofing, electrical, plumbing, heating, air IbrMitionirg, elevators,
<br />fire-eztlnguishing systems and any other permanent epuipment)
<br />_....,_.,._...__.....,,.... ...~.~...._.........._ .............._._..._._............ _....,...._,.__,.,.,....,,.,..,.w.....,., _: ._.,. ..............,.._,._.....,...._..._...,.._._....
<br />'..From To andlnciudino ~""~
<br />$1.00 - $500.00 €Included in the Issue and Fiting F
<br />j
<br />x$501.00 - $2,000.00 ~~~~~.,_»»~ ~ » ~»»»»»»'»»~»»»~»»._ ___.»._..~,- jE6.62 for each adddional $100 or
<br />;including $2,000
<br />.00 -
<br />at,uuu,oul.uo and up -$5,750.00 for the first $1,000,000 plu $4.
<br />fraction thereof
<br />B. Termde Repair Work ' 586.00 plus total valuation as listed above
<br />$0.00- $3,000 -_._._....__ ___.-..`.$131.00 ....-____~___»_._„»._._....
<br />Over $3,000 Same as for other building permits, minim
<br />ri5foo-
<br />54,000.00+
<br />up to ari151,001.00-
<br />'S~ODO.oa
<br />Or550,001.00
<br />~~'100.000.0
<br />or 15100,001.0
<br />500 000.0
<br />000 or 5500,001.0
<br />..~1~~„c~00
<br />000 or ff1.000.001
<br />This fee is in addition to the "Filing 8 Issurence" lee and other miscellaneous fees.
<br />i
<br />and documentation forprojects that are subject
<br />mended io cover the additional time necessary
<br />of state building code requirements.
<br />/orprojects electing to achieve voluntary "Tier 1"certification in the state building code.
<br />s fee is intended to cover the additional time necessary for plan review, inspection, anc
<br />fication for this tier level's requirement.
<br />for projects elee0ng to achieve voluntary "Tier 2" certification in the stare building code.
<br />s fee is intended to cover the additional time necessary for plan review, inspection, and
<br />fication for this tier leve% s requirement.
<br />!.00 for the first SI
<br />including 550,000
<br />total
<br />as
<br />i
<br />___~_ . ..~ _,»_ ..».. _ ...... ..........__ ._. »~.....__ µ._ _ , _..,,,. ~.,_._1
<br />rlus 513.00 for each additional 51,000 or fraction thereof, to
<br />rs 59.10 /or each additional 51,000 or fraction thereof, to and
<br />plus 55.20 for each additional 51,000 or fraction thereof, to-'
<br />plus 54.90 for each additional 51,000 or%raction thereof, to
<br />b plus 54.05 for each additional 51,000 or fraction thereof, to
<br />G1FEESt201411 Feest201O11 Proposed Fees.zlsz 5 /!152010
<br />
|