Laserfiche WebLink
u, a.uayac~ v rCCJ <br />.4.100: FEES. The {ollowing fees have been established by the City Coundl pursuant to various provisions of the San Leandro Murndpal Code (SLMC), San Leandro Administrative Code (SLAG) or the general laws of the State of CalKomia <br />l)esrr ton ~ Curcent Fee ~ Referen~ <br />p ce Proposed Fees 2010-2011 <br />,.. <br />IMMUNITY DEVELOPMENT DEPARTMENT - 6uilding Regulatlona Dlvlslon <br />3 Elactncal Permit (Continued) <br />Rectfiers (mercury are. vibrating and electrolytic): for each kW or kVA and fraction tnere~ a <br />.-h~ ,, ._____ ~ _....,, ...._......-..~, _,,.__ <br />$20.50 520.65 <br />21 to 50 $5100 ~.w._,.__ 551.35 <br />61 to 8o ~ $78.05~~~~~ ~~~ ~~~~~- s~ase <br />! For inspection of alterations and changes in existing wiring, each inspection visit 526.55 t26.75 <br />Photovoltaic Fees do not include issuing and Filing Fees, Automatlon fees, and other ; <br />~„ mandated fees <br />Photovoltaic - Residential rS3n nn linrlurlne nvnr_fhn_mi,nlur nhn rhorLl <br /> land 1 inverter <br />Photovoltaic - Commerdal/Industrial >8 to 48kw ~~ ;$320.00 (includes 1-1/2hr. structural plan check, 1 <br />'and 1 inverter <br />Photovoltaic - Commerdal/Industrial >48kw <br />~' $650.00 (includes 4 hrs. structural plan check, 1 <br />'arid 1 imrerter <br />...~ <br />F_ach 0 - 8kw P.V. Inverter over 1 ~~ ~~ <br />520.00 <br />Each >8 - 48kw R.V. Inverter over 1 550.00 <br />Each >48kw P.V. Inverter over 1 580.00 ~ m ~' <br />Energy Conservation: review of plans and/or energy forms for all buildings subject to the 1Direct Cost (1) with a minimum d[arge of $5775 <br />'iCalifomia Energy Commission's wnservaGon regulations (when not covered by building ; <br />`permit <br />~t A. Filing and Issuance Fee `$86.00 plus the amount shown below for each pl <br />B. Plan Check, when applicable Direct Cosl (1) <br />Exemption: Inspection of the installation of an earthquake gas shutoff valve <br />-» `;$28.00 Wilh No Filing & Issuance Fee <br />For new Residential ConsWdion and additions with valuations over $100,000 including a)116% of the building permit fee <br />':water in s i 'n waterheatin and lumbin fixtures <br />Plumbing fixture w waste discharge, each `$10.65 <br /> Plumbing fixture removed and opening sealed, each $6.10 <br /> Plumbing facture reset or set after the completion of the structure to an outlet roughed in ,$8.00 <br />- a:tnnnnauar, earn <br />posal -residential, each <br />posal - commerdal, each <br />'Captor, each, uD to 150 g: <br />iizer and clarifier), each ;$25.20 <br />.517.00 <br />water using equipment connected .» S 12.25 <br />15 <br />(1) with a m. <br />the amount <br />instanaaon, repiacemen[ or auanbonment or water service, each 51225 112.35 <br />Irrigation sprinkler system and first 20 heads 1$25.20 525.40 <br />? Each additional head 1$0.55 ~ 50.56 <br />Irrlgation Controllers 55.00 each New InspeeGon of irrigation controllers installed in sprinklers tams <br />(1) Direct Cost =hourly personnel charge plus a factor or loo}, tar tringe benefits. overhead and indirectcosts -, <br />C:1DocumeMS and SetanpslsperezLLocal SeekgslTemporary krtemet FileslCorrteM.0u1bo1dT5DVF84M12010.11 Purposed Fees 9 4272010 <br />