My WebLink
|
Help
|
About
|
Sign Out
Home
8G Consent 2010 0706
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2010
>
Packet 2010 0706
>
8G Consent 2010 0706
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 4:20:22 PM
Creation date
7/1/2010 4:20:21 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/6/2010
Retention
PERM
Document Relationships
_CC Agenda 2010 0706
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2010\Packet 2010 0706
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BID SUMMARY <br />~ ~ <br />09 S~ ~FO ` ~ j s`~ ~ 3s: -. <br />r <br />PROJECT TITLE: Toyon Park Playground Sitework <br />PROJECT NO.: 10-150-62-109 <br />BID NO.: 10-11.0003 <br />BID OPENING ENGINEER'S ESTIMATE S.R.P Company Spencon Construction, Inc. <br />DATE: Tuesday, June 29, 2010 Date Approved: 6/22/2010 4500 Wolf. Way P. O. Box 1220 <br />TIME: 1:30 PM Prepared by: MG Brentwood, CA 94531 Danville, CA 94526 <br />LOCATION: City Clerk Phone: 925-753-5142 Phone: 925-984-2581 <br /> Fax: 925-753-5864 Fax: 925-984-2583 <br />ITEM <br />NO. QUANTITY ITEM UNIT COST ITEM COST UNIT COST ITEM COST UNIT COST ITEM COST <br />1 1 LS Furnish all material, equipment, $77,500.00 $77,500.00 $48,600.00 $48,600.00 $59,375.00 $59,375.00 <br /> and labor to construct the work <br /> in the plans or specifications <br />2 1 LS Furnish all Sheeting, Shoring $2,500.00 $2,500.00 $1,000.00 $1,000.00 $8,000.00 $8,000.00 <br /> and Bracing as required <br />TOTAL BASE BID: $80,000.00 $49,600.00 $67,375.00 <br />SUBCONTRACTORS: None None <br />SECURITIES: 10% Bid Bond 10% Bid Bond <br />NOTES: <br />Reviewed by: '~~~~ ~~~ <br />Mark Ik ,Project Manager <br />Reviewed by: <br />A in Osakwe, Senior Engineer <br />Date: ` Z <br />Date: ~~_'_' <br />Bid Summary-Toyon Park Playground Sitework.xlsx Page 2 of 2 Printed 6/29/2010 @ 2:01 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.