2. FUNDING. San Leandro and Oakland shall utilize the Grant for the cost of <br />Project Design. In the event the cost of Project Design exceeds $277,500, then <br />San Leandro shall determine the amount of the overrun, confer with Oakland to <br />determine the availability of supplemental funds to cover the overrun amount, and <br />if approved by San Leandro and Oakland in each City's sole discretion, San <br />Leandro shall apportion the agreed-upon responsibility for the respective share of <br />the additional costs to San Leandro and Oakland. San Leandro and Oakland shall <br />be responsible for using good faith efforts to identify funds to cover a share of any <br />cost overrun. In the event that the Project Design is completed without utilizing <br />the entire Grant, any fund balance will be designated for San Leandro's <br />construction cost. <br />3. PROJECT ADMINISTRATION. The Parties agree that San Leandro shall <br />administer the contracts required to carry out the Project Design. San Leandro <br />shall enter into contracts with the selected design consultant and for all other <br />professional services required to carry out the Project Design. San Leandro shall <br />use its standard procedures consistent with the terms of the grant for all selection <br />and contract processes. San Leandro shall consult with Oakland prior to <br />approving, modifying, or terminating any contracts entered into pursuant to this <br />MOU. <br />4. ORGANIZATIONAL FRAMEWORK. San Leandro shall act as the lead agency <br />for the Project. Oakland shall review progress of plans and specifications at the <br />10%, 30%, 70% and 100% stages and respond to San Leandro in a reasonable <br />time period to be determined between Oakland and San Leandro engineering <br />departments. San Leandro will take the lead in scheduling periodic project <br />coordination meetings as needed. All correspondence shall be directed as follows: <br />Ude Udemezue or Danny Lau <br />City of San Leandro City of Oakland <br />835 E. 14~' Street 250 Frank H. Ogawa Plaza, Suite 4300 <br />San Leandro, CA 94577 Oakland, CA 94612 <br />5. ADDITIONAL CONSULTANTS If necessary for the efficient and proper <br />preparation of the Project Design, San Leandro may retain the services of <br />additional consultants, on an as needed basis, provided that the total cost <br />expended for the Project Design shall not exceed $277,500 without the consent of <br />the Parties. <br />6. TERM. The term of this MOU shall be 24 months from the date of this MOU, <br />unless extended by the written consent of all Parties. <br />7. TERMINATION AND WITHDRAWAL. Any Party may terminate its <br />participation in, and withdraw from, this MOU by providing the other Parties with <br />written notice of said termination and withdrawal. Such termination and <br />withdrawal shall become effective upon thirty (30) days from such written notice, <br />but shall not affect such withdrawing Party's funding obligation under Section 2 <br />of this MOU. <br />2 <br />