My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2001 SCS Development Co (2)
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2001
>
Agmt 2001 SCS Development Co (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2010 5:13:48 PM
Creation date
7/14/2010 12:06:45 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
2/20/2001
Retention
PERM
Document Relationships
Inst 2001082044
(Reference)
Path:
\City Clerk\City Council\Recorded Documents\2001
Reso 2001-025
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Modification for Unforeseeable Circumstances. Subdivider reserves the right to modify said <br />plans and specifications as the development progresses should unforeseen conditions occur, provided written <br />approval is first obtained from the City Engineer. The City shall bear no responsibility whatsoever for work <br />performed and rejected by the City Engineer. City reserves the right to make reasonable modifications to <br />the plans and specifications whenever field conditions and/or public safety require such modifications. <br />Subdivider shall pay City for all costs incurred in checking and inspection resulting from said modifications. <br />5. Work; Time for Commencement and Performance. City hereby fixes the time for the <br />commencement of the required work to be on or about the 21st day of February , 2001, and for its <br />completion to be on or before the 21st day of February , 2003. At least 15 calendar days prior to the <br />commencement of work hereunder, Subdivider shall notify the City Engineer in writing of the date fixed by <br />Subdivider for commencement thereof, in order that the City Engineer shall be able to provide services for <br />inspection. <br />6. Location of Construction Yard Subdivider agrees to locate any construction yard for the storage <br />of equipment, vehicles, supplies and materials, or the preparation or fabrication thereof, to be used in <br />connection with the installation of improvements for said subdivision or the construction of buildings <br />therein, in such a manner so as to cause a minimum of inconvenience to persons living in the areas <br />immediately adjacent to said subdivision, including installation of appropriate fencing and screening and to <br />obtain the approval of the City Engineer as to the proposed location and standards for maintenance of the <br />yard. Immediately upon completion of the last building to be constructed in the subdivision, or unit thereof, <br />to which this agreement refers, Subdivider agrees to cease using the construction yard clear the site and <br />restore it to its original condition, and to remove therefrom all supplies, materials, equipment, or vehicles <br />being stored or kept thereon. Subdivider agrees not to use the construction yard in connection with the <br />installation of improvements or construction of buildings in any other subdivision, or any other unit of the <br />subdivision to which this agreement refers. City may extend the time within which the construction yard <br />maybe used or within which supplies, materials, equipment or vehicles may be stored or kept thereon if City <br />TRACT MAP 7175 CHERRY WOOD -PHASE 3 <br />ABSTRACT OF SUBDIVISION IMPROVEMENT AGREEMENT (PRIVATE IMPROVEMENT) <br />C:\MAPS\TM7175\SUBIMPAGRPRIVATE.DOC <br />PAGE 3 OF 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.