Laserfiche WebLink
SAN LEANDRO ADMINISTRATIVE CODE <br />TITLE 12 PUBLIC WORKS <br />Chapter 5 Uniform Wastewater Discharge <br />Regulations <br />shall be assessed. If the estimated wastewater discharge is high, the City <br />shall issue a refund to the user. <br />(d) The City reserves the right to make an additional connection fee <br />assessment for an existing sewer connection if the peak month flow or <br />strength of discharge is increased above that flow or strength upon which <br />the original connection fee was based. <br />(e) Connection fee receipts shall be deposited into a separate reserve account <br />to be used for future treatment facility expansion projects, or if no future <br />expansion is required, these funds may be used to finance other treatment <br />facility improvement projects or to retire the General Fund Loan. <br />(f) Each sewer permit issued as herein provided, and the right to a sewer <br />connection pursuant to any such sewer permit so issued, shall run with the <br />land, and shall not be transferred to, or used for, any other property other <br />than the property for which the sewer permit was originally issued. <br />(g) All sewer rates, charges, and fees as herein provided shall be non- <br />refundable. <br />(h) Reference is made to the City's "Procedures and Policies for Sewer <br />Connection Fees" on file with the City Clerk and incorporated herein by <br />this reference. <br />12.5.120: WASTEWATER DISCHARGE PERMITS. <br />(a) Reference is made to the Uniform Wastewater Discharge Regulations <br />previously adopted by the City ofSan Leandro as Title iII, Chapter 14, <br />and on file with the City Clerk. All references herein to "Regulations" <br />shall be to the aforementioned regulations. <br />(b) The Regulations require that Major Contributing Industries, as defined in <br />Section 3-14-200 of the Regulations, connected to or discharging into the <br />City sewer must obtain a Pretreatment Permit. <br />(c) Section 3-14-520 of the Regulations lists standard permit conditions. <br />03-OS-O1 8 <br />