|
SAN LEANDRO ADMINISTRATIVE CODE
<br />TITLE 6
<br />Chapter 4
<br />FINANCE
<br />Fees
<br />2001-02
<br />Proposed
<br />§6.4.100: FEES. The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code (SLMC), San Leandro Administrative
<br />Code (SLAG) or the general laws of the State of California.
<br />Des ' tion Current Fee Reference 2001-02 Pro osed Chan es
<br />DEVELOPMENT SERVICES DEPARTMENT -Environmental Services Division
<br />
<br />1. Hazardous Materials Stora e SLMC 3-3-100
<br />
<br /> A. Annual fees for storage of combustible liquids,
<br />corrosives, flammable gases, flammable liquids,
<br />flammable solids, nonflammable gases, organic
<br />peroxides, other regulated materials, oxidizers,
<br />oisonous asses, oisonous materials 1 Quantity Range 1 (2) $ 75.00 ~
<br />Quantity Range 2 $150.00 i
<br />Quantity Range 3 $225.00 ~
<br />Quantity Range 4 $300.00 ~
<br />ti Ran e 5 $375.00 j Quantity Range 1 (2) $ 80.00
<br />Quantity Range 2 $160.00
<br />Quantity Range 3 $240.00
<br />Quantity Range 4 $320.00 j
<br />Quantity Range S $400.00
<br />
<br /> B. Annual Fees for Storage of Radioactive Materials
<br />1 $110.00 i __, $115.00
<br /> j
<br /> C. Above ound Tank Installation Permit 3
<br /> Each Tank $225.00 ! $240.00
<br /> Each Additional $ 75.00 $ 80.00
<br /> i
<br /> ~ - -
<br />
<br />
<br />(1) Includes permit processing and two inspections annually (one annual and one reinspection) for compliance with the Uniform Fire Code, review of the HMBP, and review of all
<br />emergency response plans
<br />(2) Quantity Range 1 Less than or equal to S00 pounds, SS gallons, or 2, 000 cubic feet at SIP.
<br />Quantity Range 2 Greater than S00 pounds, SS gallons, or 2, 000 cubic feet at SIP, but less than or equal to S, 000 pounds, SSO gallons or 20, 000 cubic feet at SIP, respectively.
<br />Quantity Range 3 Greater than S, 000 pounds, SSO gallons, or 20, 000 cubic feet at SIP, but less than or equal to S0, 000 pounds, S, S00 gallons or 200, 000 cubic feet at SIP,
<br />respectively.
<br />Quantity Range 4 Greater than S0, 000 pounds, S, S00 gallons, or 200, 000 cubic feet at SIP, but less than or equal to 500, 000 pounds, SS, 000 gallons, or 2, 000, 000 cubic feet at SIP,
<br />respectively.
<br />Quantity Rarige S Greater than 500, 000 pounds, SS, 000 gallons, or 2, 000, 000 cubic feet at SIP.
<br />(3) Includes plan review, field inspections, and permit processing. Time for inspections is two hours for the first tank and one hour each additional tank. Additional inspections will be
<br />charged at $9t%00/hr.
<br />03/09/01 22 Exhibit A
<br />
|