My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2001 John Cahalan Landscape Architects
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2001
>
Agmt 2001 John Cahalan Landscape Architects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2010 2:11:15 PM
Creation date
7/14/2010 2:11:14 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
3/19/2001
Retention
PERM
Document Relationships
Reso 2001-053
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br />~ ~ ~ _ <br />11. GOVERNMENTAL REGULATIONS. To the extent that this Agreement maybe funded <br />by fiscal assistance from another governmental entity, Contractor shall comply with all <br />applicable rules and regulations to which City is bound by the terms of such fiscal assistance <br />program. <br />12. DOCUMENTS. All reports, data, maps, models, charts, studies, surveys, photographs, <br />memoranda or other written documents or materials prepared by Contractor pursuant to this <br />Agreement shall become the property of City upon completion of the work to be performed <br />hereunder or upon termination of the Agreement. <br />13. COMPLIANCE WITH APPLICABLE LAWS. Contractor shall comply with all laws <br />applicable to the performance of the work hereunder, including, but not limited to, laws <br />prohibiting discrimination based on race, religious creed, color, national origin, ancestry, <br />physical handicap, medical condition, marital status or sex. <br />14. USE OF RECYCLED PRODUCTS. Contractors shall prepare and submit all reports, <br />written studies and other printed material on recycled paper to the extent it is available at equal <br />or less cost than virgin paper. <br />15. PROFESSIONAL SEAL. Where applicable in the determination of the contract <br />administrator, the first page of a technical report, first page of design specifications, and each <br />page of construction drawings shall be stamped/sealed and signed by the licensed professional <br />responsible for the report/design preparation. The stamp/seal shall be in a block entitled "Seal <br />and Signature of Registered Professional with report/design responsibility" as per sample below. <br />Seal and Signature of Registered Professional wish <br />rep~rtldesign responsibility <br />Exhibit D <br />6/12/95 rev. <br />5/20/97 rev. <br />Page 6 of 6 <br />Marina Entrance Improvements Construction <br />
The URL can be used to link to this page
Your browser does not support the video tag.