My WebLink
|
Help
|
About
|
Sign Out
Home
Inst 2010177024
CityHall
>
City Clerk
>
City Council
>
Recorded Documents
>
2010
>
Inst 2010177024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2010 1:50:02 PM
Creation date
7/15/2010 1:50:01 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
6/17/2010
Recorded Document Type
Agreement to Conditions
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Approval) will begin on the date of the conditional approval of this Project. If the <br />applicant fails to file a protest within this 90-day period, complying with all of the <br />requirements of Government Code Section 66020, the applicant will be legally <br />barred from later challenging any such fees, dedications, reservations or other <br />exactions. <br />D. All mitigation measures identified in the Kaiser Permanente San Leandro Medical <br />Center /Mixed Use Retail Development Project EIR are included in the <br />Mitigation Monitoring and Reporting Program (MMRP) which is included in <br />these conditions of approval and are incorporated herein by reference.. The project <br />Applicant shall be responsible for compliance with all applicable mitigation <br />measures adopted and with all conditions of approval set forth below, subject to <br />the review and approval of the City of San Leandro. <br />E. Applicant shall be responsible for paying the costs of any third party inspections <br />and/or inspectors as required by the Mitigation Monitoring and Reporting <br />Program (MMRP). <br />F. Construction of Phase 1 of the Medical Center shall commence within eighteen <br />(18) months following City Council approval, and shall be substantially <br />completed by year 2015. For the purpose of compliance with this condition, <br />commencement of construction shall be defined as the construction of a <br />substantial portion of the street improvements and infrastructure. <br />G. Pursuant to Zoning Code Section 3-1024 the developer may request from the <br />Planning Commission renewal of the Planned Development project approval for <br />up to two additional years if it finds the renewal is consistent with the Code and <br />that no substantive change has occurred in conditions or circumstances pertinent <br />to the planned development. Application for renewal shall be made in writing to <br />the Zoning Enforcement Official not less than 30 days or more than 120 days <br />prior to expiration of the Planned Development approval. Denial of a request for <br />renewal of the Planned Development Project approval maybe appealed. <br />H. The approvals granted by the City as a result of this application, as well as the <br />Conditions of Approval, shall be recorded in the Office of the County Recorder of <br />Alameda County <br />II. PERMITTED USE <br />A. This Planned Development is an approval to construct Phase 1 of the San Leandro <br />Kaiser Medical Center. Phase 1 of the Medical Center includes an approximately <br />436,000 square foot, six-story hospital containing up to 264 licensed beds; an <br />approximately 275,000 square foot, four-story Hospital Support Building located <br />immediately adjacent to and connected to the hospital; a central utility plant and <br />up to 2,100 parking spaces in a surface parking lot. The site is an approximately <br />PLN2009-00030 Page 5 of 47 <br />Conditions of Approval May 3, 2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.