Laserfiche WebLink
MARINA SQUARE AUTO MALL EXPANSION <br />.DRAFT MITIGATION MONITORING PLAN <br /> MONITORING <br />IMPACT MITIGATION REQUIRED RESPONSIBILITY TIMING <br />Geology and Soils <br />3. a., The site has a low to • Prior to Site Plan Review approval for the McKevitt and Batarse City Engineer and Building Prior to Site Plan Review <br />c., moderate potential for Trust sites, the respective future property owners shall be required to Official approval. <br />and d expansive soils and is located submit asite-specific final geotechnical report, to be reviewed and <br /> within a seismically active approved by the City Engineer and Building Official. Any <br /> area. recommendations contained in the report shall become conditions of . <br /> approval and be included on the plans submitted for building permit <br /> approval. <br /> • Prior to issuance of a grading permits for the McKevitt and Batarse Building Official Prior to issuance of grading <br /> Trust sites, the respective applicants shall submit all information, permits. <br /> including a Grading Plan accompanied by Soils Engineering and <br /> Engineering Geology Reports, in accordance with requirements of <br /> the City of San Leandro Municipal Code Title VII, Chapter 12. <br />Hydrology and Water Quality <br />4. a., To date, asite-specific or • Prior to Site Plan Review approval, asite-specific hydrology study City Engineer Prior to Site Plan Review <br />d., e. project-specific hydrological for the McKevitt and Batarse Trust site, paid for by the respective approval. <br /> study has not been performed, future developers, shall be prepared which, at a minimum analyzes <br /> although Phase I and II the potential impacts of the proposed project with regards to water <br /> Environmental Assessments quality, groundwater use and degradation, affect on existing <br /> have found low levels of drainage patterns, and the potential for increased run-off. The <br /> pesticides in the groundwater. hydrology studies shall be submitted to the City Engineer for review <br /> and approval. <br /> • Prior to issuance of grading permits for each phase of construction City Engineer and Alameda Prior to issuance of grading <br /> , <br />an erosion control plan shall be developed for the respective County Flood Control permits for each phase of <br /> development sites in order to minimize any erosion that may occur District construction. <br /> during grading. Protection measures may include implementing silt <br /> fencing, hay bales and/or sand bags. The erosion control plan shall <br /> be submitted to the City Engineer and Alameda County Flood <br />rvianna square Huto iviau expansion - llrart MMY Page 1 <br />